Similar Projects
New Fire Station 82 - North Shore Fire Department
New Construction
Design
$3,000,000 est. value
Glendale, WI 53209

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Design
$50,000 CJ est. value
Milwaukee, WI 53209

Replace Building 6 A-Wing Roof
Renovation
Sub-Bidding
$1,000,000 CJ est. value
West Milwaukee, WI 53214

2021 Time & Material County Grounds - Roofing
Term Contract
Post-Bid
West Allis, WI 53214

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

2021 Time & Material Parks Facilities
Term Contract
Results
Milwaukee, WI

Police Station Remodel
Renovation
Results
Wauwatosa, WI 53226

Arlington Court 2nd Floor Roof Repair
Alteration
Post-Bid
Milwaukee, WI 53202

Replace Roof
Results
Milwaukee, WI 53206

Green Roof Maintenance for Convent Hill and Lapham Park
Alteration
Post-Bid
Milwaukee, WI 53212

Riverside Campus Roof Recoating Area A
Results
Milwaukee, WI 53211

Green Roof Irrigation System Maintenance For Convent Hill & Lapham Park
Alteration
Post-Bid
Milwaukee, WI 53212

13th Street Roof and HVAC Upgrades
Alteration
Results
Milwaukee, WI 53221

Aluminum Roof Coating for Various Sites, System Wide
Renovation
Post-Bid
$300,000 CJ est. value
Milwaukee, WI 53202

Buildings 306 and 307 Roof Replacements
Infrastructure
Results
Oak Creek, WI 53154

Last Updated 08/16/2022 04:07 AM
Project Title

Hales Corners Fire Department Roof Replacement

Physical Address View project details and contacts
City, State (County) Hales Corners, WI 53130   (Milwaukee County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Fire/Police Station, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Architect - 07/20/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of roof replacement of all roof areas consisting of ballasted EPDM membrane swap and all asphalt shingles. Replacement of sheet metal, components, including cap flashing, counter flashing, metal edge flashing, gutters, downspouts, and penetration flashings. Replacement of stainless through-wall flashing at the masonry wall of the hose tower. Installation of new 2'x2'x2" concrete pavers over an EPDN slip sheet. Other auxiliary work as noted in the specifications and drawings.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents