Similar Projects
3000 Celery
New Construction, Infrastructure
Conception
$5,000,000 est. value
Sanford, FL 32771

I-4 Industrial Park Lot 7 - Office/Warehouse
New Construction - 21,200 SF
Design
$1,000,000 est. value
Sanford, FL

Seminole County Fire Station 12 Driveway-Parking Lot Replacement
Infrastructure
Bidding
$800,000 est. value
Altamonte Springs, FL 32714

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Country Club Subdivision Sidewalk Improvements
Results
Less than $430,000 est. value
Sanford, FL 32771

Milling and Paving
Results
Less than $250,000 est. value
Lake Mary, FL

Myrtle Ave. Streetscape
Results
Less than $2,700,000 est. value
Sanford, FL 32771

Public Works Minor Construction Projects with Costs less than $2,000,000.00
Results
Less than $15,000,000 est. value
FL

Add Lanes and Reconstruct/Drainage Improvements
Results
$18,109,846 est. value
FL

Seminole County Fire Station Asphalt Replacement
Results
Geneva, Winter Park, FL 32732

Miscellaneous Roadside Repair
Infrastructure
Results
$400,000 est. value

Quail Pond Circle (PW 1701)
Infrastructure
Results
$343,519 est. value
Casselberry, FL 32707

Sand Lake Road at West Lake Brantley Road Improvements
Infrastructure
Results
$99,761 est. value
FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

City Hall Complex Parking Lot Repair and Sealcoat
Infrastructure
Results
$29,500 est. value
Altamonte Springs, FL 32701

Reported 07/21/2022 12:00 AM
Project Title

Construction of Sunrail Station Bicycle and Pedestrian Connectivity Improvements

Physical Address View project details and contacts
City, State (County) Altamonte Springs, FL   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value $8,900,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Contractor to provide all necessary labor, equipment, tools, materials, supplies and incidentals to perform the construction of the new flexible path improvements for pedestrian, bicyclists and transit which includes roadway, sidewalk, trail, drainage and landscaping improvements on various roadways throughout the City including, but not limited to, SR 436, Palm Springs Dr and Central Pkwy. The project begins at the Seminole Wekiva Trail adjacent to Sanlando Park and ends at the Altamonte Springs SunRail station. Project includes many elements including wider sidewalks, multi-use trail, curb and gutter sections, new raised curb medians, inlets, piping, lighting and roadway reconstruction and pavement rehabilitation, landscaping, irrigation and signalization improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents