Similar Projects
Lincoln Elementary School Site Improvements
Results
Morton, IL 61550

Miscellaneous Water Pipe, Valves, Fittings, and Other Accessories
Results
Morton, IL

Repair Broken Fire Hydrant Piping Under Concrete Slab
Term Contract
Results
East Peoria, IL 61611

Water Main Improvements
Infrastructure
Post-Bid

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Leopold Street Water and Sewer Extension
Infrastructure
Post-Bid
$215,000 est. value
Mackinaw, IL 61755

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Water Main Replacement - Various Locations
Alteration
Results
$590,000 est. value
North Pekin, IL

Fast Avenue Water Main Extension
Infrastructure
Results
$400,000 est. value
Mackinaw, IL 61755

Water System Improvements
Renovation, Infrastructure
Bidding
$300,000 est. value
Groveland, IL

Installation of New Traffic Signals, Pavement Markings, ADA Ramp, Curb and Gutter, Riprap, Median Reconstruction
Infrastructure
Bidding
$600,000 CJ est. value
Pekin, IL 61554

Construction of the Erie Court Watermain Extension Project
Infrastructure
Bidding
$455,000 est. value
Morton, IL 61550

HMA Milling and Overlay; Class D Patches
Infrastructure
Bidding
$2,000,000 CJ est. value
Morton, IL 61733

Hot-in-place Recycling of Existing Asphalt Pavement; Aggregate Wedge Shoulders; New Pavement Markings
Infrastructure
Bidding
$300,000 CJ est. value
Creve Coeur, IL 61610

Last Updated 07/25/2022 01:34 PM
Project Title

Water Main Relocation 1007-1009 Main Street Project

Physical Address View project details and contacts
City, State (County) Creve Coeur, IL 61610   (Tazewell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $404,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All bidders are hereby advised that they must be able to submit, if requested by the Owner, an Illinois Department of Transportation prequalification statement and/or Capital Development Board Certificate of Eligibility for this project prior to opening bids. Bids for "All Work" Bids will be held good and may not be withdrawn for a period of 60 calendar days from due date. Every bid shall consist of two (2) completed copies of Bid Documents and shall be accompanied by bid guarantee consisting of bid bond, certified check or cashier's check made payable to the Village of Creve Coeur, in amount of five percent of total of bids upon which Contractor is bidding. Failure of bidder to submit bid bond, certified check or cashier's check in amount to cover proposals bid upon is cause for rejection of this bid. Commencement of the work may begin as early as August 11th, 2022. The project shall be substantially completed within 30 calendar days of the preconstruction meeting or October 28, 2022, whichever occurs sooner. The Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of the Owner, such action will serve the best interest of the Owner. Bids on all work of this contract shall be subject to the provisions of the "Illinois Prevailing Wage Act" (Illinois Revised Statues, Chapter 48, Section 395S - 1-

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents