Similar Projects
Z--Provide Cyclic Maintenance to Preserve the Historic Province Lands Visitor Center
Design
Provincetown, MA 02657

Repair of Water Damaged Walls, Roderick L. Ireland Court
Alteration
Bidding
$100,000 est. value
Springfield, MA 01103

Replacement of Kitchen Cabinets for Boston Fire
Alteration
Bidding
Boston, MA

One Trade Contractor Package - Waterproofing, Dampproofing and Caulking
Alteration
Sub-Bidding
$27,480,645 est. value
Boston, MA

East Brookfield District Court - Ductwork Remediation
Alteration
Sub-Bidding
$7,376,335 est. value
East Brookfield, MA 01515

Belmont Fire Department Headquarters Interior Repairs
Post-Bid
Less than $50,000 est. value
Belmont, MA 02478

Replace Section of Kitchen Ceiling Approx. 520 Sq. Ft.
Post-Bid
Less than $20,000 est. value
Boston, MA

15 Pleasant Street - Toilet Room Upgrades
Results
$30,000 est. value
Stoughton, MA

Remove Remaining Existing Suspended Ceilings and Metal Grids
Results
Less than $30,000 est. value
Stoughton, MA 02072

Garage and Mezzanine Insulation Replacement
Alteration
Bidding
Ashburnham, MA 01430

Water Intrusion and Floor Repair - Green Line Riverside Car House
Post-Bid
Less than $160,000 est. value
Boston, MA

12 Channel Street Operations Center - General Bid
Results
Less than $1,996,916 est. value
Boston, MA

Doris Bunte RAD Conversion - Filed Sub Bids
Post-Bid
Boston, MA

Bruce School Soundproofing
Results
Less than $140,000 est. value
Lawrence, MA 01841

Street Botolph RAD Conversion - Filed Sub-Bid
Post-Bid
Boston, MA

Last Updated 08/18/2021 03:15 PM
Project Title

Kitchen Renovations at Attleboro Fire Station Headquarters

Physical Address View project details and contacts
City, State (County) Attleboro, MA   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $31,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will remove existing cabinet, counter tops, and acoustic ceiling. Contractor will properly dispose of all waste in a contractor supplied dumpster. Contractor will supply and install kitchen cabinet, counter, back splash and acoustic ceiling to owners specifications. Contractor will repair plaster on interior wall around kitchen windows. New sink will be installed in counter with new faucet and install existing garbage disposal. Reconnect existing dishwasher. Kitchen existing layout will remain the same. Existing floor to remain. Existing fire sprinkler heads will remain no relocations will be needed. Existing kitchen appliances will remain. Existing electric and lighting will remain.

Details

Division 09 - Finishes.
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents