Similar Projects
Medicine Bow Roads Phase 2 Project
Infrastructure
Bidding
Medicine Bow, WY

2022 Asphalt and Concrete Repair Projects
Infrastructure
Bidding
$300,000 est. value
Cheyenne, WY

WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Post-Bid
Jackson, Teton Village, WY 83001

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Mule Creek Junction - Newcastle (US 85 and US 16)
Infrastructure
Bidding
$200,000 est. value
Lance Creek, WY 82222

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

District 4 Logo Signs
Infrastructure
Bidding
$200,000 est. value
Gillette, WY

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Sheridan, WY 82801

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

District 1 Contract Patching
Infrastructure
Bidding
$200,000 est. value
Cheyenne, WY 82009

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Last Updated 04/27/2022 04:49 AM
Project Title

Laramie Streets (3rd St. and Flint St.)

Physical Address View project details and contacts
City, State (County) Laramie, WY 82072   (Albany County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Electrical, Bituminous Surfacing, Sidewalk, Curb And Gutter, Traffic Control, Drainage, Grading, Striping And Miscellaneous Work On Approximately 0.10 Mile On Us 30/Us 287 Beginning At Rm 328.02 In The Town Of Laramie. 1 109.04000 Force Account Work 22,000.000 $$ 2 109.08000 Mobilization 1.000 Ls 3 202.03120 Removal Of Signs (Est. Lump Qty: 4 Ea) 1.000 Ls 4 202.03295 Removal Of Inlets 2.000 Ea 5 202.03300 Removal Of Storm Sewer 45.000 Ft 6 202.03400 Removal Of Surfacing 235.000 Sy 7 202.03430 Removal Of Sidewalk 215.000 Sy 8 202.03445 Removal Of Curb And Gutter 225.000 Ft 9 202.03455 Removal Of Double Gutter 125.000 Sy 10 202.03600 Cutting Bit Pvmt 540.000 Ft 11 202.03610 Cutting Concrete 270.000 Ft 12 203.02500 Unclassified Excavation 70.000 Cy 13 206.03100 Flowable Backfill 50.000 Cy 14 209.01000 Water 6.000 Mg 15 215.01000 Contractor Storm Water Control 1.000 Ls 16 301.01065 Bed Course Material 24.000 Cy 17 301.01085 Crushed Base 128.000 Cy 18 406.03005 Plant Mix (Commercial) 55.000 Ton 19 506.01036 Drilled Shaft Foundations 36 In 36.000 Ft 20 603.20012 Rcp 12 In 42.000 Ft 21 603.20018 Rcp 18 In 8.000 Ft 22 608.10200 Sidewalk (Conc) 294.000 Sy 23 609.10200 Curb And Gutter Type a 365.000 Ft 24 609.10400 Curb And Gutter Type c 10.000 Ft 25 609.10700 Double Gutter 210.000 Sy 26 611.10100 Highway Monuments 12.000 Ea 27 620.07000 Adjustments, Fire Hydrants 1.000 Ea 28 620.07010 Adjustments, Valve Boxes 4.000 Ea 29 625.10300 Manhole Type c 1.000 Ea 30 625.12000 Manhole Adjustment 2.000 Ea 31 625.20100 Inlet Type a 2.000 Ea 32 625.22000 Inlet Adjustment 2.000 Ea 33 701.20700 Reset Pull Box 6.000 Ea 34 702.30500 Sign Panels, Aluminum 40.000 Sf 35 703.03100 Flagging 250.000 Hr 36 703.03110 Temporary Traffic Control 1.000 Ls 37 703.03200 Sequential Chevron 1.000 Ls 38 703.03210 Portable Variable Message Sign 2.000 Ea 39 799.70105 Thermoplastic Pavement Markings 116.000 Sf 40 799.70118 Thermoplastic Pavement Markings 18 In 480.000 Ft Hsip-n232069: 73 - 701.29800 - Electrical Conductors - Lump Sum 41 701.29070 Single Conductor Wire #8 Awg 2,200.000 Ft 42 701.2908b Tracer Conductor Wire #10 Awg 700.000 Ft 43 701.31010 Signal Cable 3 Conductor #14 Awg 200.000 Ft 44 701.31020 Signal Cable 5 Conductor #14 Awg 1,300.000 Ft 45 701.31030 Signal Cable 7 Conductor #14 Awg 400.000 Ft 46 701.3106e Signal Cable 20 Conductor #14 Awg 600.000 Ft 47 701.31800 Lighting Cable 3 Conductor #12 Awg 140.000 Ft 48 701.36500 Radar Detector Cable 900.000 Ft 49 701.3800e Cat5e Ethernet Cable 450.000 Ft Hsip-n232069: 80 - 701.71000 - Traffic Signal System - Lump Sum Description: # Item Description Quantity Unit 50 701.12300 Conduit Boring 1,700.000 Ft 51 701.17120 Conduit-Rigid Pvc 2 In 100.000 Ft 52 701.17130 Conduit-Rigid Pvc 3 In 200.000 Ft 53 701.20200 Pull Box Type b 4.000 Ea 54 701.2025a Pull Box Type Rb 1.000 Ea 55 701.21310 Service Point Pedestal 1.000 Ea 56 701.2180c Junction Box Nema 4.000 Ea 57 701.24050 Stl Pole Type v 4.000 Ea 58 701.40100 Connector Kit - Fused i 4.000 Ea 59 701.40300 Connector Kit - Unfused i 4.000 Ea 60 701.4610c Communication Swing Panel 1.000 Ea 61 701.4610j Signal Controller Cabinet Footing 1.000 Ea 62 701.50050 Signal Indication 12-12-12 14.000 Ea 63 701.51100 Ped Signal Indication 8.000 Ea 64 701.5220a Louvered Backplate 6.000 Ea 65 701.53100 Mast Arm Framework 6.000 Ea 66 701.53300 Side Bracket Framework 8.000 Ea 67 701.58200 Radar Presence Detector 4.000 Ea 68 701.58205 Radar Mounting Bracket 4.000 Ea 69 701.5821c Pre-Assembled 19in Rack 1.000 Ea 70 701.59100 Ped Detector 8.000 Ea 71 701.59300 Communication Antenna 1.000 Ea 72 701.62100 Roadway Luminaire 4.000 Ea 73 701.8123a Remote Video Camera - Ptz 1.000 Ea Arsct-n232a02: 5 - Roadway Description: # Item Description Quantity Unit 74 109.08000 Mobilization 1.000 Ls 75 202.03305 Milling Plant Mix 1,320.000 Sy 76 202.03400 Removal Of Surfacing 30.000 Sy 77 202.03430 Removal Of Sidewalk 5.000 Sy 78 202.03445 Removal Of Curb And Gutter 65.000 Ft 79 202.03455 Removal Of Double Gutter 20.000 Sy 80 202.03600 Cutting Bit Pvmt 175.000 Ft 81 202.03610 Cutting Concrete 30.000 Ft 82 203.02500 Unclassified Excavation 20.000 Cy 83 209.01000 Water 6.000 Mg 84 215.01000 Contractor Storm Water Control 1.000 Ls 85 301.01085 Crushed Base 22.000 Cy 86 406.03005 Plant Mix (Commercial) 310.000 Ton 87 608.10200 Sidewalk (Conc) 8.000 Sy 88 609.10200 Curb And Gutter Type a 120.000 Ft 89 609.10700 Double Gutter 55.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents