Similar Projects
Taxiway Rehabilitation & Electrical Improvements
Infrastructure
Bidding
$640,000 CJ est. value
Brothers, OR 97712

South West 209th Avenue Kinnaman Road to Alexander Street Precast Concrete Pipe and Structures
Alteration
Post-Bid
Hillsboro, OR 97129

Columbia Children's Arboretum Improvement Project
Alteration
Post-Bid
Portland, OR

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Concrete Installation Services
Alteration
Results
$150,000 est. value
Hillsboro, OR

Covered areas, Concrete Slabs, and Sidewalks
Infrastructure, Alteration
Post-Bid
$2,000,000 est. value
Brookings, OR 97415

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
Oregon City, OR 97045

Concrete Installation, Repair and Maintenance Services
Alteration
Post-Bid
Salem, OR

Precast Concrete Storm Pipe and Structures for SW 209Th Ave
Alteration
Results
Hillsboro, OR

MPCO(Multi-layer Polymer Concrete Overlay) Epoxy for Salem Bridge Crew
Alteration
Post-Bid
Salem, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Office Remodel - Oregon Department of Transportation District 11 Office
Build-out
Post-Bid
$350,000 CJ est. value
Klamath Falls, OR 97603

Concrete Pad replacement and Concrete Sidewalk and Pad
Infrastructure, Alteration
Results
$300,000 est. value
Culver, OR

Last Updated 04/22/2023 08:01 AM
Project Title

Cordon Road Turn Pockets at Hayesville Drive and Kale Street

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,350,117 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 20,2023. project was awarded to Carter & Company, Inc., awarded amount is $1,350,117.19.** The contract consists of the following major items: Item, Quantity, Unit General Excavation, 1 Lump Sum Storm Detention, 1 Lump Sum Cold Plane Pavement Removal, 0-2" Deep, 4,800 (total) Sq. Yards Aggregate Shoulder, 700 (total) Tons Aggregate Base, 4,700 (total) Tons Level 3, 1/2 " Dense, PG 64-22, ACP 2,450 (total) Tons Level 3, 1/2 " Dense, PG 64-22, ACP In Base Plug, 3,050 (total) Tons Thermoplastic, Non-Profile, 120MIL, Sprayed, 30,500 (total) Feet Obtain required bid documents via free download by registering on the OregonBuys website at https://oregonbuys.gov/bso/ and searching for Marion County Construction of two left turn lane refuges on Cordon Road, work will include excavation, stormwater pipe, aggregate base, asphalt paving and pavement markings as called for in the Plans and Specifications and such additional Incidental Work as requested by the Engineer. The estimated total project cost range is $1,000,000 to $2,500,000. CORDON AT HAYESVILLE DRIVE NO.: 104809 CORDON AT KALE STREET NO.: 104807

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents