Similar Projects
CSAH 21 Box Culvert Replacement
Results
Hastings, MN 55033

2021 Street Rehabilitation
Results
$6,500,000 est. value
Lakeville, MN

Pond Cleanout
Results
$205,000 est. value
Burnsville, MN

2021 Street Improvement
Results
$2,500,000 to $3,500,000 est. value
Burnsville, MN

155th Street and Pilot Knob Roadway Improvements and Orchard Place Pilot Knob Turn Lane Improvements
Results
Less than $3,144,211 est. value
Apple Valley, MN 55124

Erickson Park Storm Water Improvements
Bidding
Apple Valley, MN

Eagandale Industrial Park Street and Stormwater Quality Improvements
Bidding
$2,095,000 est. value
Eagan, MN

2020 Pond Cleaning
Renovation
Results
$110,000 est. value
West Saint Paul, MN 55118

2020 Rosemount Pond Maintenance
Results
Rosemount, MN

Highview Avenue Improvement
Results
$1,500,000 to $1,700,000 est. value
Lakeville, MN 55024

2021 Street and Utility Improvements
Results
$4,672,127 est. value
Apple Valley, MN

2021 Maintenance Overlay Highland Forest Area
Results
Burnsville, MN

Twin Lakes Drainage Improvements
Bidding
$800,000 to $1,100,000 est. value
Burnsville, MN

4th Street South Reconstruction
Bidding
South Saint Paul, MN 55075

Bryant Lane Area Improvements
Bidding
Inver Grove Heights, MN 55076

Last Updated 03/03/2021 12:44 AM
Project Title

Storm Water and Water Quality Ponds EP-4 and LP-40

Physical Address View project details and contacts
City, State (County) Eagan, MN 55121   (Dakota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $145,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to construct the Work. The Work is the routine maintenance of stormwater ponds including sediment removal and placement of riprap. The work includes mobilization and demobilization; installing erosion and sediment control BMPs; clearing and grubbing; dewatering and control of water; 550 Tons of MPCA regulated sediment removal and disposal; 56 Tons of Riprap, various sizes; all as provided for in the bidding documents. All quantities and work items in this advertisement for bid are approximate and not guaranteed. Two locations. One is southwest of the intersection of Dodd Road and Holiday Lane. The other is west of the intersection of Wilderness Run Road and Lexington Avenue S.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents