Similar Projects
On-Call HVAC Services
Post-Bid
Birmingham, AL 35255

Volker Hall, 5th Floor, Air Handler Replacement
Post-Bid
$210,000 to $245,000 est. value
Birmingham, AL 35233

HVAC Maintenance, Service and Replacement Project
Results
Dothan, AL

J--HVAC Units Replacement w/Connection to Siemens Building Automation System, Currently in Place at the Station.
Results
Tuscaloosa, AL 35404

Chiller Maintenance Service Various Schools
Post-Bid
Mobile, AL 36618

Coleman Coliseum Service Level HVAC Replacement
Results
$200,000 to $400,000 est. value
Tuscaloosa, AL

Tuscaloosa Fire Station #1 HVAC Upgrades Project
Post-Bid
Tuscaloosa, AL 35401

Replacement of HVAC Units
Results
Selma, AL 36703

Capitol HVAC Repair and Controls Upgrade Capitol Operations
Post-Bid
Less than $850,000 est. value
Montgomery, AL 36130

Marine AC Unit 30,000 BTU
Results
Huntsville, AL 35899

HVAC Condenser Unit Relocation at the HABD Elyton Village Housing Community
Post-Bid
Birmingham, AL 35233

Construction of the Bryant Denny Stadium Chilled Water Distribution
Results
Tuscaloosa, AL 35487

Cullman County Courthouse HVAC Replacement
Post-Bid
Cullman, AL 35055

Causey Middle School Chiller Change - Out
Results
Mobile, AL 36695

Cleaning of Hoods and Vents
Post-Bid
Birmingham, AL 35294

Last Updated 09/17/2020 12:30 PM
Project Title

Mary Harmon Bryant Fume Hood Ventilation

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL   (Tuscaloosa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,135,665
Plans Available from Engineer - 04/07/20
Owner View project details and contacts
Architect View project details and contacts
Description

Remove all existing fume hood fans from the Penthouse/Attic on the 5th floor level. Consolidate fume hood exhaust to a centralized fan system, to be located outside on the roof in the location of the former cooling tower. Remove existing fume hood fan exhaust stacks within the attic, abandon ducts where they pass through the roof, and abandon exterior on the roof. Cap on each side and infill to prevent air and water intrusion. Existing roof to remain at former cooling tower location (new centralized fan location), add to the cooling tower structure as needed to support new Lab fan to avoid modification of existing roof. No exterior roof work anticipated in this project. Review replacement of the general building exhaust fans and connecting to the new centralized fume hood system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents