Similar Projects
Sgt Cleans Car Wash / Wooster
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Wooster, OH 44691

Clinton Sewer System - Construction - Summit County
Infrastructure
Conception
$7,000,000 CJ est. value
Doylestown, OH 44230

Roadway Minor Rehab - US 250
Infrastructure
Design
$1,674,950 CJ est. value
Wooster, OH 44691

Roadway Minor Rehab - SR 585
Infrastructure
Design
$1,935,460 CJ est. value
Wooster, OH 44691

Bridge Replacement (1 Bridge) - US 250
Demolition, New Construction, Infrastructure
Bidding
$1,276,646 CJ est. value
Wooster, OH 44691

Marshallville Preserve
Infrastructure
Bidding
$211,847 CJ est. value
Marshallville, OH 44645

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

RFP D/B - Honeytown Road Bridge Design-Build Project
New Construction, Infrastructure
Post-Bid
$711,353 CJ est. value
Wooster, OH 44691

WAY-VAR Wooster Streets FY23 Resurfacing Project
Infrastructure
Results
$950,841 CJ est. value
Wooster, OH 44691

WAY-CR 0580-00.58
Infrastructure
Results
$627,850 CJ est. value
Rittman, OH 44270

Back Street Resurfacing
Infrastructure
Construction
$90,000 CJ est. value
West Salem, OH 44287

Melrose Drive Residential Development
New Construction, Infrastructure
Pending Verification
$31,500,000 CJ est. value
Wooster, OH 44691

Schaeffler Group Addition / Wooster
Addition, Infrastructure - 89,595 SF
Pending Verification
$11,000,000 CJ est. value
Wooster, OH 44691

Intersection Improvement (Safety) - SR 57
Infrastructure
Design
$2,363,443 CJ est. value
Marshallville, OH 44645

2022 Scratch Pave Project
Infrastructure
Post-Bid
$629,985 CJ est. value
Wooster, OH 44691

Last Updated 09/18/2023 03:04 PM
Project Title

Shreve Lake Wildlife Area Dam Improvements

Physical Address View project details and contacts
City, State (County) Shreve, OH 44676   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,616,895 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Shreve Lake Wildlife Area Dam Improvements Contract Estimated Cost General Contract $4,636,275.00 Alternate 1 $235,000.00 EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents