Similar Projects
New City Hall Complex & Westside Fire Station No. 2
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Downtown Largo City Hall
New Construction
Design
$25,000,000 est. value
Largo, FL 33779

Tarpon Springs City Clerks Office Renovation
Renovation - 2,500 SF
Design
Tarpon Springs, FL 34689

Highland Park Village Office Building
- 705 SF
Post-Bid
Lake Wales, FL

Miami Dade College Dyer Courthouse Renovation
Renovation
Post-Bid
Miami, FL 33132

Design Build for the Seminole County Justice Center and Public Safety Administration Building
Results
Less than $65,625,000 est. value
Sanford, FL

Sheriff's Office Operations Center Lobby Improvements
Results
Less than $160,000 est. value
Daytona Beach, FL 32124

Waller Park Renovations ADA Improvements Capitol Building
Renovation
Construction
Tallahassee, FL 32301

New City Hall and Municipal Campus Improvements
- 120,000 SF
Construction
Sunrise, FL

North Dade Government Center, Landmark Site
- 15,500 SF
Design
$7,500,000 est. value
Miami, FL 33055

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Additions and Renovations to Havana Community Center and Fire Station
Renovation, Addition
Results
Less than $168,760 est. value
Havana, FL 32333

New Ocoee City Hall
New Construction - 40,000 SF
Construction
$12,000,000 est. value
Ocoee, FL 34761

Judicial Renovations
Renovation, Addition - 21,356 SF
Design
Brooksville, FL 34601

City Hall Elevator Modernization
Post-Bid
Less than $400,000 est. value
Hialeah, FL

Last Updated 08/18/2021 06:08 AM
Project Title

Orange County Courthouse Public Defender Office Space Renovations

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $545,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconfiguration of various spaces on the 1st, 3rd, 4th and 5th floors of Courthouse Building A. A. The project is the interior renovation of floors 1, 3, 4, and 5 in Building A of the Public Defender’s office. These areas are identified on the drawings as: 1. Remove interior wall, storefront, millwork, and ceiling tiles and grids for addition of office spaces and the reconfigure of offices spaces. 2. Additionally, work will include, Fire Protection, Mechanical, Power System, Lighting System, and Fire Alarm.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents