Similar Projects
Last Updated | 12/27/2023 04:03 PM |
Project Title | New Building for New Glarus Primary School |
Physical Address | View project details and contacts |
City, State (County) | New Glarus, WI 53574 (Green County) |
Category(s) | Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Elementary School, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Abandoned, Construction start expected April 2024 |
Bids Due | View project details and contacts |
Estimated Value | $14,000,000 [brand] Estimate |
Plans Available from | Copy Center - 12/14/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 30, 2023, bids were over budget. As of December 27, 2023, the owner has decided to cancel the project. New Glarus Primary School, this is project 1 of 3 packages (High School/Middle School-STEM Addition and 4K-Elementary School are separate packages). JP Cullen's Milwaukee Division is looking to team with subcontractors on a hard bid project in New Glarus, WI. Project consists of a new 76,665 sqft primary school. Structure: precast structural concrete, steel framing and masonry bearing walls with metal roof deck. Exterior wall systems: masonry cavity wall, metal wall panels and fiber-cement panels Shell: aluminum curtainwall, storefronts & entrances, EPDM roof system Interior: CMU walls, studs & drywall, painting, overhead coiling doors, sectional doors, resilient tile, carpet, resinous flooring, wood gymnasium flooring, glass partitions, gym equipment, elevator, MEP's Exterior: site utilities, asphalt paving, fencing, landscaping. Aluminum curtainwall, storefronts and entrances, and windows along with an EPDM roof system completes the building shell. Interior construction includes CMU walls, metal framing and gypsum board, painting, overhead coiling doors, full-glass sectional doors, resilient tile/carpet tile and resinous flooring, wood gymnasium flooring, sliding glass partition, gymnasium equipment and scoreboards, and other finishes as indicated on the Contract Documents. Two-story portion of the building equipped with a hydraulic elevator. Project Location: New Glarus, Wisconsin 53574 PROJECT: 00377087, 021-374 |
||||||||||||||||||||||||||||||||||||||||||
Details | 76,665 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |