Last Updated | 10/16/2023 09:37 PM |
Project Title | Huffman Creek Pump Station and Outfall |
Physical Address | View project details and contacts |
City, State (County) | Pineville, LA 71360 (Rapides County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $7,200,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Instructions to Bidders, Bid Form, Agreement Between Owner and Contractor, Forms of Bid Bond, Performance and Payment Bonds, The project includes the demolition of two obsolete drainage pump stations; the construction of a drainage pump station with an enlarged pump sump to accommodate two (2) new mixed axial flow drainage pumps, each with a capacity of 50,000 gpm. The pump station will have auxiliary power for control systems; installation of two (2) parallel steel discharge penstocks (48 diameter) over the levee. The pump station will be constructed in close proximity to an existing pump house that is to remain in service housing two (2) 50,000 gpm hydraulic drainage pumps. The project will also include the construction of a 1.2 acre storm water detention pond located upstream of the Cottingham Expressway near Jones Street. The estimated construction cost totals $7,200,000. The OWNER reserves the right to reject any or all bids for just cause. Such actions will be in accordance with Title 38 of the Louisiana Revised Statutes (LRS). Each Bidder must deposit with the bid, security in the amount of at least five percent (5%) of the total bid price, as described in the Instructions to Bidders. Bid bonds shall be written by a surety or insurance company meeting the requirements noted in L.R.S. 38:2218; with the exception that sureties used for obtaining bonds on federally funded projects must appear as acceptable on the U.S. Department of Treasury Circular 570. The successful Bidder shall be required to furnish a Performance Bond and Payment Bond, in an amount equal to 100% of the Contract amount, written by a surety or insurance company meeting the requirements noted in L.R.S. 38:2219 A. (1)(a), (b) and (c); with the exception that sureties used for obtaining bonds on federally funded projects must appear as acceptable on the U.S. Department of Treasury Circular 570. Attention of Bidders is called particularly to the requirements for conditions of employment to be observed and minimum wage rates to be paid under the Contract (Davis-Bacon Act), Section 3 (Low Income Resident Participation) of the Housing and Urban Development Act of 1968, Section 109 (Non-Discrimination) of the Housing and Community Development Act of 1974, Section 503 (Non-Discrimination Against Employees with Disabilities) and Section 504 (Non-Discrimination Against Individuals with Disabilities) of the Rehabilitation Act of 1973, Segregated Facilities, Executive Order 11246, and all applicable laws and regulations of the Federal government and State of Louisiana and bonding and insurance requirements. Minority owned firms, small businesses, and/or Section 3 businesses are encouraged to participate |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |