Similar Projects
45th Street Watermain Extension - W-036 - City of Elmo
Infrastructure
Conception
$400,000 est. value
Lake Elmo, MN 55042

Phase 3 Regional Drainage Improvements - SW-002 - City of Lake Elmo
Infrastructure
Conception
$500,000 CJ est. value
Lake Elmo, MN 55042

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

Preserve Trail Development / Woodbury
Infrastructure
Design
$5,184,990 CJ est. value
Saint Paul, MN 55125

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Gold Line Duck Bank Relocation
New Construction, Infrastructure
Post-Bid
$3,781,503 CJ est. value
Saint Paul, MN 55101

2022-2023 Lift Station and Forcemain Improvements
Renovation, Infrastructure
Results
Forest Lake, MN

Hudson Road Turn Lanes at Karen Drive and Trunk Water Main Improvements
Infrastructure
Results
$1,000,000 est. value
Woodbury, MN 55125

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Royal Gateway
New Construction, Infrastructure - 435,000 SF
Construction
$234,000,000 CJ est. value
Woodbury, MN 55129

RFP Design - Lake Elmo Park Reserve Swim Pond Recreation Area Improvements
New Construction, Infrastructure, Renovation
Pending Verification
$4,390,000 CJ est. value
Lake Elmo, MN 55042

County Road 65 - Reconstruction - RB-2621 - Washington County
Infrastructure
Pending Verification
$9,800,000 CJ est. value
West Lakeland, MN 55082

New or Refurbished Ballfields - PR-017 - City of Elmo
Infrastructure
Conception
$1,000,000 CJ est. value
Lake Elmo, MN 55042

Valley Creek Road Trail - Colby Lake Underpass to Dancing Waters Parkway - City of Woodbury
Infrastructure
Design
$1,500,000 CJ est. value
Woodbury, MN 55125

Utility Potholing in Lake Elmo Park Reserve
Infrastructure
Post-Bid
Lake Elmo, MN 55042

Last Updated 06/21/2023 02:24 PM
Project Title

Grange Trunk Water Main Improvements

Physical Address View project details and contacts
City, State (County) Cottage Grove, MN 55016   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,036,796 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2023, the project has not been awarded. A timeline for award has not been confirmed. Utility Street Construction and Excavation Major quantities for the Work include: 1,554 LF HDD 16" PVC DR 18 Water Main 3,869 LF 16" Water Main Ductile Iron CL 52 3,900 LF Asphalt Bike Trail 2,000 CY Topsoil Borrow 800 TON Trail Bituminous Mixture 67 LF Concrete Curb & Gutter 1 ACRE Clearing And Grubbing 500 CY Rock Excavation 1 LS Trench Dewatering 1 LS Storm Bypass Pumping 1 LS Traffic Control 14,000 LF Silt Fence, Preassembled 4,000 SY Erosion Control Blanket Category 0 10 EACH Storm Inlet Protection 8,400 SY Hydro Seeding The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening Bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents