Similar Projects
Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Caldwell Drive Stormwater Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Hampton, GA 30228

Caldwell Drive Stormwater Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Hampton, GA 30228

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Lake Lanier Islands Force Main Replacement Phase 2 Project
Infrastructure
Post-Bid
Buford, GA 30518

West Street Pedestrian Improvements
Infrastructure
Post-Bid
Valdosta, GA

SPLOST VII Sidewalk Project
Results
Albany, GA

Large Water Meter Testing
Term Contract
Results
GA

Jackson EMS Station #3 Addition
Addition, Demolition, Renovation, Infrastructure - 2,054 SF
Bidding
$500,000 CJ est. value
Atlanta, GA 30334

Water System Improvement - Materials Only
Infrastructure
Post-Bid
Ludowici, GA

Ps 4116 Rehabilitation and Force Main Upgrades
Results
Brunswick, GA

Water System Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Unadilla, GA 31091

Claxton High School Barn
New Construction, Infrastructure
Post-Bid
$125,500 CJ est. value
Claxton, GA 30417

Old Atlanta Highway Phase 4 and 5
Results
Cumming, GA

Last Updated 07/25/2022 02:05 PM
Project Title

Rough Grading Phase 1A and 1B of Stanton Springs North (Rivian)

Physical Address View project details and contacts
City, State (County) Social Circle, GA 30025   (Walton County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions received after 5:00 PM on July 13, 2022, may not be answered Preparation of an approximately 500-acre pad, including but not limited to clearing, grubbing, grading, and limited storm drainage for the Rivian facility.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents