Similar Projects
Sebring High School Resurfacing
Post-Bid
Sebring, FL 33870

Widening Right Turn Lane
Results
Less than $248,019 est. value
FL

Asphalt Repair
Results
$400,000 est. value

Resurfacing
Results
Less than $2,066,728 est. value
FL 33852

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Intersection Improvement - Widening - Base Work
Infrastructure
Results
$1,750,277 est. value
FL

Cr 623 (Kenilworth Boulevard) Mill and Resurfacing Between Mini Ranch Road and Haywood Taylor Boulevard
Infrastructure
Results
$1,200,000 est. value
Sebring, FL 33870

Add Turn Lane(s) Drainage Milling and Resurfacing - SR 700 (US 98)
Infrastructure
Results
$828,799 est. value
FL

Intersection Improvement Concrete Pavement Milling and Resurfacing Base Work - SR 25 and SR 70
Infrastructure
Results
$7,866,150 est. value
FL

Arbuckle Creek Road Turn Lane Highlands County
Infrastructure
Results
Sebring, FL 33870

Intersection Improvement - Bidirectional Median - Widening -SR 25 (US 27)
Infrastructure
Results
$656,355 est. value
FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Silicone Joint Sealer
Infrastructure
Bidding

West Stryker Road Roadway Improvements
Infrastructure
Results
Avon Park, FL 33825

Last Updated 03/17/2022 12:21 PM
Project Title

Haywood Taylor Rehabilitation

Physical Address View project details and contacts
City, State (County) Sebring, FL   (Highlands County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing and grubbing (removal of existing asphalt areas no longer used) Milling and resurfacing of existing asphalt pavement Reworking of existing limerock base material Removal of certain patched existing asphalt pavement areas and replacement with new stabilization, base, and asphalt Removal of existing cracked/broken concrete sidewalk and replacement with new concrete sidewalk and detectable warnings Removal and replacement of cracked/broken concrete valley gutter Lining of certain existing storm drainage pipes to seal them internally Removal and replacement of storm pipe Cleaning and sealing of certain storm drainage manholes and inlets Placing flowable fill in voids adjacent to certain existing storm drainage inlets Removal of two existing roadways and construction of new roadways along the same alignments (Bid Alternate 1) Earthwork Sodding

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents