Last Updated | 07/02/2021 01:41 PM |
Project Title | Power Plant Road Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Redwood Falls, MN (Redwood County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes the construction of approximately: 1620 CY Common Excavation 2490 SY Geotextile Fabric, Type V 3050 Ton Aggregate Base, Class 5 285 Ton Type SP 9.5 Wearing Course Mixture (SPWEA240B) 425 Ton Type SP 12.5 Non-Wearing Course Mix (SPNWB230B) 1510 LF Concrete Curb & Gutter, Design B618 42 LF 12” RC Pipe Sewer Class V 180 LF 18” RC Pipe Sewer Class III 17 LF 24” RC Pipe Sewer Class III 18.4 LF Construct Drainage Structure, Design 48-4020 17.9 LF Construct Drainage Structure, Design R-1 210 CY Concrete Grade Beam 50 CY Concrete Retaining Wall 15 EA Type 1 – All-Thread Tensioned Rockbolt 60 LF Add`l Type 1 Rockbolt 16 EA Type 2 – All-Thread Untensioned Rockbolt 60 LF Add`l Type 2 Rockbolt 910 SF Concrete Bin-Wall 1200 CY Select Granular Backfill Modified 200 CY Class B Crushed Rock together with numerous related items of work, all in accordance with Plans and Specifications. COMPLETION OF WORK: All work under the Contract must be complete by August 1, 2022. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |