Similar Projects
Last Updated | 01/26/2023 10:03 PM |
Project Title | Western Dubuque CSD Field Package A |
Physical Address | View project details and contacts |
City, State (County) | Epworth, IA 52045 (Dubuque County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | No Prebid. Bids will be publicly opened and tabulated on said day and hour and will then be acted on by the Board of Education at their meeting per the Notice of Public Hearing , for their consideration and action. Board meetings will all be held in the Board Room at the Administrative Central Office in Farley, Iowa 52046. A more detailed description of the kinds and approximate quantities of materials and types of construction for which bids will be received are set forth in the Bidding Documents prepared by ISG, Inc. of Des Moines, Iowa, which, together with the proposed form of contract, have heretofore been approved by the Board of Education of the Western Dubuque Community School District, and are now on file for public examination at the District's Administration Office in said City, and are by this reference made part hereof as though fully set out and incorporated herein. All sealed bids in connection therewith shall be submitted to the Board of Directors of the Western Dubuque Community School District on or before the time herein set for letting. All proposals shall be made on official proposal forms furnished by the Architect/Engineer and must be enclosed in a separate sealed envelope and plainly identified and addressed to the Western Dubuque Community School District. If a bid is to be mailed, the bid envelope shall be sealed in a regular mailing envelope. FAX and E-mail Bids will not be accepted. The Owner reserves the right to reject any or all bids and to waive informalities and to hold and consider the bids for 45 days after the date of the bid opening. The contract will be awarded to the lowest, responsive, responsible bidder. Each proposal shall be accompanied by a bid bond, certified check, cashier's check or certified share draft, in an amount equal to five percent (5%) of the total amount of the proposal. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or the certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the Western Dubuque Community School District. Said check or share draft may be cashed, or the bid bond forfeited as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days of issuance of a Notice of Award and post bond satisfactory to the School District insuring the faithful fulfillment of the contract and maintenance of said improvements as required by law. The bid bond should be executed by a corporation authorized to contract as a surety in the State of Iowa and must not contain any conditions either in the body or as an endorsement thereon. The successful bidder will be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Board of Education of the Western Dubuque Community School District of Farley, Iowa, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the Board of Education of the Western Dubuque Community School District. Payment of the cost of said project will be made from such cash funds of the Western Dubuque Community School District as may be legally used for said purpose at the discretion of the Western Dubuque Community School District. The Contractor will be paid ninety-five per cent (95%) of the Architect's/Engineer's estimate of the value of acceptable work completed at the end of the preceding month. Final payment will be made not less than thirty-one (31) days after completion of the work and acceptance by the Board of Education of the Western Dubuque Community School District, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa. No such final payment will be due until the Contractor certifies to the Board of Education of the Western Dubuque Community School District that the materials, labor, and services involved in the final estimate have been paid for in accordance with the requirements stated in the specifications. The Western Dubuque Community School District of Farley, Iowa is exempt from paying Sales and Use Tax and will supply Contractor with an "Iowa Sales Tax Exemption Certificate" and an authorization letter to allow the Contractor to buy equipment and material for the project without paying Sales and Use tax. The work shall commence the 22nd day of May 2023, and after receipt by the contractor of a written notice to proceed and shall be substantially completed on or before the 4th day of August 2023, subject to any changes in the contract period as provided for in these specifications and granted by the Board of Education. The Work on shall be finally completed by, and ready for final payment, on or before the 18th day of August 2023, subject to any changes in the contract period as provided for in these specifications and granted by the Board of Education of the Western Dubuque Community School District. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. Plans and specifications governing the construction of the proposed improvements have been prepared by the Architect/Engineer. These plans and specifications, and the proceedings of the Board of Education of the Western Dubuque Community School District referring to and defining said improvements, are hereby made a part of this Notice and the proposed contract by reference, and the proposed contract shall be executed to comply therewith. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |