Similar Projects
Water Main Replacement
Design
Elmwood Park, IL

Water Meter Replacement Project Phase II
Infrastructure
Bidding
Evanston, IL

Bayside Forcemain Replacement
Infrastructure
Bidding
Hanover Park, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Large Meter Testing
Term Contract
Post-Bid
Wheeling, IL 60090

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Dogwood Street Water Main Replacement
Results
$1,000,000 to $5,000,000 est. value
Park Forest, IL 60466

Construction project in the Sunnyside Neighborhood off of Cottage Grove Avenue
Infrastructure
Bidding
Ford Heights, IL

Water Main Valve Exercising
Term Contract
Post-Bid
Orland Park, IL

Automated Meter Reading (AMR) System Installation Services
Results
Midlothian, IL

Meter Replacement Program Evaluation
Infrastructure
Bidding
Orland Park, IL

Purchase and Delivery of Fire Hydrant(S), Auxilary Valve(S), and Accessories
Post-Bid
Des Plaines, IL

Caldwell Water Main Crossing Replacement
Results
Less than $132,667 est. value
Morton Grove, IL 60053

Water Main Improvements and Street Resurfacing
Infrastructure
Bidding
Evanston, IL

Fire Hydrants and Accessories
Post-Bid
Mount Prospect, IL

Reported 02/26/2022 12:00 AM
Project Title

Construction Observation Services for the Water Main Replacement

Physical Address View project details and contacts
City, State (County) Northbrook, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the replacement of an existing 4” cast iron water main that was constructed in 1941 and is approximately 1,000 feet in length. The existing main dead ends at 1810 South Lane. In FY 2021/2022, the Village selected a consultant to prepare detailed engineering design plans for the replacement of the existing South Lane water main as well as the construction of the approximately 400 feet of new looping main to Driftwood Lane.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents