Similar Projects
I-70th to 104th Ave Widening Independent Cost Estimating
Infrastructure
Bidding
CO

Citywide Bike - Bike Lane Package 1
Post-Bid
$1,070,000 to $1,300,000 est. value
Denver, CO

2021 Citywide Chip Seal and Crack Seal
Post-Bid
$4,000,000 to $4,400,000 est. value
Denver, CO

2020 General Civil On-Call Construction (Sbe)
Results
Denver, CO

Citywide Bike - Gvr (Pbl)
Results
Less than $460,000 est. value
Denver, CO

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Signal and Intersection Improvement Package 1 in Three Locations
Results
Less than $1,000,000 est. value
CO

Asphalt and Concrete Paving and Street Restoration
Post-Bid
Denver, CO

2020 General Civil On-Call Construction (SBE)
Results
Less than $5,000,000 est. value
Denver, CO 80202

On Call Region 1 Asphal Paving Services
Post-Bid

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Design Services for 56th Ave. Widening - Peoria to Pena
Results
Denver, CO

Tower Farms
Post-Bid
CO

Last Updated 11/16/2021 04:18 PM
Project Title

Design-Build Services for the 56th Avenue Widening Project - Peoria Street to Pena Boulevard

Physical Address View project details and contacts
City, State (County) Denver, CO 80238   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of widening 56th Avenue from Peoria Street to Peña Boulevard to a four-lane typical section while establishing the footprint for an ultimate six-lane typical section. The Project also includes constructing a multi-use path along the north side of 56th Avenue, including connections to the neighborhood bike lanes and the trail system at the Rocky Mountain Arsenal National Wildlife Refuge. The four-lane roadway widening of 56th Avenue should be designed to minimize rework when the six-lane section is constructed in the future. Preparing for the ultimate six-lane section includes locating the median, curb and gutter, multi-use path, drainage, signage, lighting, signals, utilities, and other elements in their ultimate locations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents