Similar Projects
Last Updated | 03/27/2021 02:42 AM |
Project Title | Road Resurfacing on U.S. 11W (S.R. 1) |
Physical Address | View project details and contacts |
City, State (County) | TN (Grainger County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No. HSIP-1(437), 29001-4232-04 (PIN 129165.00), 29001-3232-94 (PIN 129165.00) The resurfacing (thin lift or thin lift D) on U.S. 11W (S.R. 1) from near Promiseland Road (L.M. 6.13) to near Loop Circle (L.M. 14.22). Project Length - 8.090 miles Project No. 29030-4228-04 (PIN 127102.00) The resurfacing (thin lift or thin lift D) on S.R. 375 from near Helton Road (L.M. 11.36) to U.S. 25E (S.R. 32). Project Length - 6.890 miles. 208-01.05 Brooming & Degrassing Shoulders 30.000 l.m. 307-01.15 Asc Mix (Pg64-22) (Bpmlc-Hm) Grading Cs 2,427.000 Ton 403-01 Bituminous Material For Tack Coat (Tc) 205.000 Ton 411-12.03 Scoring For Rumble Stripe (Noncontinuous) (8in Width) 13.000 l.m. 411-12.04 Scoring For Rumble Stripe (Noncontinuous) (4in Width) 11.000 l.m. 415-01.02 Cold Planing Bituminous Pavement 418.000 s.y. 705-02.10 Guardrail Transition 27in To 31in 3.000 Each 705-04.09 Earth Pad For Type 38 Gr End Treatment 1.000 Each 705-06.20 Tangent Energy Absorbing Term Mash Tl-3 1.000 Each 705-06.30 Gr Terminal (Energy Absorbing) Mash Tl-2 2.000 Each 712-01 Traffic Control (1) Ls 712-04.01 Flexible Drums (Channelizing) 246.000 Each 712-05.01 Warning Lights (Type a) 124.000 Each 712-06 Signs (Construction) 1,369.000 s.f. 716-01.21 Snowplowable Raised Pavement Markers (Bi-Dir) (1 Color) 1,018.000 Each 716-01.22 Snowplowable Raised Pavment Markers (Mono-Dir)(1 Color) 135.000 Each 716-01.30 Removal Of Snowplowable Reflective Marker 490.000 Each 716-02.04 Plastic Pavement Marking(Channelizationstriping) 57.000 s.y. 716-02.05 Plastic Pavement Marking (Stop Line) 310.000 l.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 6.000 Each 716-05.20 Painted Pavement Marking (6" Line) 37.000 l.m. 716-13.02 Spray Thermo Pvmt Mrkng (60 Mil) (6in Line) 61.000 l.m. 717-01 Mobilization (1) Ls 411-03.07 Acs Mix(Pg64-22) Thin Lift Asphalt 12,135.000 Ton 411-03.12 Acs Mix(Pg64-22) Thin Lift d Asphalt 12,135.000 Ton |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |