Similar Projects
Mountain of Fire & Miracles Ministries Guesthouse
New Construction, Infrastructure - 19,508 SF
Design
$1,000,000 CJ est. value
Houston, TX 77075

Family Dollar / Baytown
New Construction, Infrastructure - 9,180 SF
Design
$734,400 CJ est. value
Baytown, TX 77521

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Ivy Kids Early Learning Center
New Construction - 10,396 SF
Post-Bid
Houston, TX 77008

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Ivy Kids Learning Center
New Construction - 15,484 SF
Construction
$2,800,000 est. value
Spring, TX 77379

O'Reilly Auto Parts (CP3) / Cypress
New Construction, Infrastructure - 7,200 SF
Construction
$1,300,000 CJ est. value
Cypress, TX 77429

Eagle's Trace RB 3.2
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Houston, TX 77077

Katy ISD Schmalz Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 20,532 SF
Pending Verification
$7,133,736 CJ est. value
Houston, TX 77084

Storm Sewer, Sanitary Sewer and Water Lines to Serve Morton Creek Ranch Sections 24 and 26
Infrastructure
Post-Bid
TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Greater Heights School
New Construction - 23,273 SF
Construction
$2,000,000 est. value
Houston, TX 77009

(H69) 22053 / O'Reilly Auto Parts
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,000,000 CJ est. value
Houston, TX 77032

Last Updated 12/22/2022 12:32 PM
Project Title

New Coolwood Head Start Center + Public Utilities

Physical Address View project details and contacts
City, State (County) Houston, TX 77013   (Harris County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Pre-School/Daycare, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $6,035,235 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Harris County Department of Education ("HCDE" or "Owner") is seeking Competitive Sealed Proposals from qualified proposers to provide construction services for the construction of a New Head Start Center located at 767 Coolwood Dr, Houston, TX 77013. The project scope of work consists of the construction of a new facility. The new 13,830 square foot Head Start Center will consist of 6 classrooms, a multi-purpose room, a conference room, a kitchen, and a teacher's workroom to satisfy 120 students along with site drainage, utilities, and site improvements. In addition to the site improvements, the project also includes the modifications of existing storm sewer in the public right-of-way and approximately 455 linear feet of new sanitary sewer line in the public right-of-way to service Coolwood Head Start Center. The estimated budget for this project is $6,164,139.48 This procurement, any award under this procurement, and the resulting contract, if any, is subject to approval by the HCDE Board of Trustees. Subsequent to required approval, the only person authorized to commit HCDE contractually is the Superintendent or his designee. This solicitation is an invitation for sealed proposals and neither this solicitation nor the response or the proposal from any prospective proposer/contractor shall create a contractual relationship that would bind HCDE until such time as both HCDE and the selected proposer/contractor sign a legally binding contract, which includes, without limitation, the terms required by HCDE. Actual work to be performed and the schedule for performance under this solicitation will be upon the terms, conditions, and timelines agreed upon by HCDE and the selected contractor. Time is of the essence for this project. The estimated substantial completion date for the Project is December 15, 2023. All Work listed in the construction documents shall be substantially completed by December 15, 2023 or 365 calendar days from issuance of the full Notice to Proceed, whichever is later. Final Completion of the entire project must be achieved no later than 30 calendar days after Substantial Completion. The contract resulting from this procurement, if any, shall include the following liquidated damages clause and liquidated damages rates: The Work to be performed under the Agreement shall be substantially completed by the date set forth in the Agreement, or by such dates thereafter as may be established in any written extensions granted under Article 8 of the General Conditions. The parties hereto agree that time is of the essence of this Contract and in all phases of the Work, and that actual and direct damages would be suffered by the Owner if the Contractor does not substantially or finally complete all Work called for in the Contract Document by the specified dates. Such actual and direct damages are, and will continue to be, impracticable and extremely difficult to determine. Execution of the Agreement under these specifications shall constitute the agreement by Owner and Contractor that the amounts stated herein are the minimum value of the costs and actual and direct damages caused by failure of Contractor to complete the Work within the allotted or agreed extended times of Substantial or Final Completion, that such sums are liquidated direct damages and as all not be constructed to be as a penalty, and that such sums may be deducted from payments due Contractor if such delay occurs. It is therefore expressly agreed, as a part of the consideration inducing the Owner to execute this Contract, that the Owner may deduct from any payment(s) due to the Contractor a sum equal to One Thousand Dollars ($1,000.00) for each and every calendar day beyond the date set forth in the Agreement for Substantial Completion or Final Completion of the Work included in the Contract Documents. It is expressly understood that said sum per day is agreed upon as a real, justified, and fair estimate of the pecuniary damages which will be sustained by the Owner in the event that the Work is not substantially or finally completed within the agreed time, or with the legally extended time, if any, otherwise provided for herein. Said sum includes the estimated daily cost of Government inspection and superintendence, as well as amounts for other expected expenses associated with delayed construction. Said sum shall be considered as liquidated damages only, and in no sense shall be considered a penalty or forfeiture, said damage being caused by, but not limited to, additional compensation for personnel, attorneys' fees, architectural fees, engineering fees, program management fees, inspection fees, storage costs, food service costs, transportation costs, utilities costs, costs of temporary facilities, loss of interest on money, and other miscellaneous increased costs, all of which are difficult of exact ascertainment. Failure to complete the Work within the designated or agreed extended dates of Substantial or Final Completion, shall be construed as a breach of the Agreement Question Cutoff Date: 11/10/2022 04:00 PM (AT)

Details

3 Stories Above Grade, 68,375 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents