Similar Projects
Tremont Fountain Improvements
Bidding
Upper Arlington, OH 43221

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Multiple Building Chiller Replacements
Post-Bid
Less than $1,200,000 est. value
Columbus, OH

Domestic Water Heater Replacement
Results
Reynoldsburg, OH

DEV-Emergency Repair
Results
Columbus, OH

Boiler Controls
Post-Bid
Columbus, OH

Boiler Replacement
Results
$2,140,197 est. value
Columbus, OH

Boiler Repair Service
Post-Bid
Columbus, OH

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

FCBDD 2021 ECLC Boilers Replacement
Post-Bid
$115,000 est. value
Columbus, OH 43214

Fawcett - Boiler Replacement
Results
Less than $572,700 est. value
Columbus, OH

DOW OPS - 2.5 Gallon Electric Water Heaters
Post-Bid
Columbus, OH

RPAC-Heating Hot Water Renovation
Results
Less than $662,000 est. value
Columbus, OH

Boiler Replacement at North High School
Results
Less than $669,200 est. value
Westerville, OH 43081

Boiler Inspections New Buildings
Results
Columbus, OH

Last Updated 10/29/2020 03:44 PM
Project Title

J--Cooling Towers - Refurbish/Repair

Physical Address View project details and contacts
City, State (County) Columbus, OH 43219   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

COOLING TOWERS REFURBISH: contractor to provide labor, materials and equipment to repair/refurbish two Marley Cooling Towers at the Chalmers P. Wylie VA ACC: Work is to include remove existing fill in two cells and dispose of in dumpster provided by the vendor. Mechanically grind cold water basin of two cells to the Society for Protective Coating (SSPC)-SP15 finish and coat with CIM urethane membrane, sealing towers water tight. Mechanically grind wetted area sidewalls of two cells to a SSPC-SP15 finish, overlay areas as necessary with sheet metal and coat with CIM urethane membrane, sealing towers water tight. Install new Brentwood Industries heavy duty XF-75 15mil Fill Pack provided by the vendor for two cooling towers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents