Similar Projects
Parking Lot Management Services
Post-Bid
Alexandria, VA 22314

FEI Facility Engineering, Operations and Maintenance, and Conference Support Services
Term Contract
Post-Bid
Charlottesville, VA 22093

Graffiti Removal Services
Term Contract
Results

Graffiti Removal Services
Term Contract
Results

Pest Control Services
Post-Bid
Waynesboro, VA

N62470-19-R-2004 Base Operations Support (BOS) Services at Naval Support Activity (NSA) Northwest Annex, Chesapeake, Virginia
Results
Chesapeake, VA

Window Cleaning Services for Department of General Services (DGS) Pocahontas Building
Post-Bid
Richmond, VA 23219

Rental and Cleaning of Portable Toilets
Results
Norfolk, VA 23507

Pest Control Services
Term Contract
Post-Bid
Chesapeake, VA 23320

Fort Belvoir Integrated Pest Management
Results
Fort Belvoir, VA 22060

Portable Toilet Rentals
Term Contract
Post-Bid
VA

Portable Toilet Rental
Results
Virginia Beach, VA 23461

Fertilizers
Term Contract
Post-Bid
Newport News, VA

Latrines Hand-washing Stations and Grey Water Tank Rental and Service
Results
Bowling Green, VA

Fungicides and Herbicides
Term Contract
Post-Bid
Newport News, VA 23607

Reported 01/03/2020 12:00 AM
Project Title

Beaver Control and Structure Removal

Physical Address View project details and contacts
City, State (County) Chesapeake, VA   (Chesapeake City County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Furnish all materials, equipment, and labor needed in order to complete task orders at locations as assigned in accordance with the Scope of Work. B. Trapping, removal, and disposal of nuisance beaver populations and dams within the City of Chesapeake as directed by the Department of Public Works Stormwater Administrator (SW Admin.) or Designee. Contractor will obtain any necessary permit(s) from the City for any work within the public rights-of-way and drainage easements. The City will obtain any ownership, easements, and/or rights-of-entry for any work to be performed on private lands not currently covered by a public drainage easement at locations where the Contractor is directed to work. The Contractor shall not trespass on private property, and the Contractor will properly dispose of beaver carcasses. The Contractor may retain and sell pelts recovered from performance of the work to the extent allowed by applicable laws and regulations. C. Removal of dams and associated structures as directed by the SW Admin. or Designee. If high water levels preclude initial removal, dams shall be opened to the bottom of the channel four (4) feet wide at the top and two (2) feet wide at the bottom; the entire dam structure is to be removed once water levels have dropped and conditions allow for a safe working environment. It is the Contractor’s responsibility to prevent downstream debris and flooding by removal and proper disposal of all debris.

Details

Division 01 - General Requirements, Temporary Controls, Temporary Pest Control.
Division 10 - Specialties, Pest Control Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents