Similar Projects
North Pavilion Sixth Floor CT Room 1 Equipment Replacement
Renovation
Bidding
$600,000 to $800,000 est. value
Birmingham, AL

UAB E-ICU Phase II Infrastructure Upgrades
New Construction
Bidding
Birmingham, AL

UAB Health System North Pavilion Sixth Floor Ct Room 2 Equipment Replacement
Renovation
Post-Bid
$400,000 to $600,000 est. value
Birmingham, AL 35249

USA Health - University Hospital - 11th Floor
Renovation - 20,000 SF
Post-Bid
Mobile, AL 33617

UAB Vaults 3 and 4 Varian Identify System Infrastructure
Renovation
Results
Birmingham, AL 35249

Callahan Eye Hospital CEH POB Elevator Package
Renovation
Results
Birmingham, AL 35233

Washington County Hospital Emergency Department
Addition - 6,602 SF
Construction
Chatom, AL 36518

Piedmont Healthcare Center
Addition - 6,700 SF
Construction
$1,400,000 est. value
Piedmont, AL 36272

Highlands 6 North Improvements
Renovation
Bidding
Birmingham, AL 35205

North Pavilion 6th Floor Flouro Room Equipment and Renovations
Post-Bid
Birmingham, AL

Renovation of the Men's and Women's Restrooms at the First and Second Floors
Renovation - 500 SF
Results
AL 35242

Children's of Alabama
Renovation
Construction
$5,400,000 est. value
Birmingham, AL 35233

Northport Medical Center - Sitework and Utility Package
Renovation
Bidding
$750,000 est. value
Northport, AL 35476

CWEB 1 Roof Replacement
Renovation
Post-Bid
Mobile, AL 36604

WIC Citronelle Building Renovations and Additions
Renovation, Addition
Results
Citronelle, AL 36522

Reported 11/03/2021 12:00 AM
Project Title

UAB Heart and Vascular Center North Pavilon 6th Floor - Lab 8 Equipment Replacement and Renovation

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35294   (Jefferson County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $600,000 to $800,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation and equipment installation of an existing Heart and Vascular procedure room. The work will be performed using Infection Control measures so that clinical operations can continue without interruption. The project is located contiguous with fully functioning patient clinical areas.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents