Similar Projects
Last Updated | 04/08/2022 08:09 AM |
Project Title | Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Metcalf, Ochlocknee, Thomasville, GA 31792 (Thomas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,734,682 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: Furnish all materials, labor, and equipment to resurface approximately 27.98 miles on Roddenberry Road, Baldwin Road, Dixie Chastain Road, Egg and Butter Road (bet US 19 and SR 188), Airline Road, Centennial Road (bet Airline and Lawhorn), Newton Road, Pallbearer Road, Stephenson Road, M & M Road, Vinson Road, Lake Riverside Subdivision (Doe Run Circle, Longwood Drive, Bradford Road, Knoll Road, Point Road, West Shore Drive, Spiral Road, Lake Shore Drive, Lake Point Ln), including traffic control and striping to Georgia DOT standards. Minimum Requirements: The contractor shall furnish the following: all materials, labor, equipment and services necessary to perform the job. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |