Similar Projects
Reported | 03/31/2022 12:00 AM |
Project Title | Firestone Horizontal Well (FAST) Pump Station Project |
Physical Address | View project details and contacts |
City, State (County) | Longmont, CO 80504 (Weld County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This will be a raw-water pump station to be installed over an existing concrete wet well fed by a horizontal alluvial well. The project includes construction of a wood frame building, HVAC, electric power, and associated building improvements. Owner is pre-procuring the pumps for the facility and the contract requires the Contractor to install the pumps and associated controls. Contractor shall coordinate pump controls with Owner’s SCADA integrator. Contractor shall install pump station piping and yard piping to connect to existing raw water line. Contractor will be responsible for obtaining and complying with building permit and stormwater quality permits. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |