Similar Projects
Oak Harbor Intermediate School
New Construction, Renovation
Conception
Oak Harbor, WA 98277

White River High School
Renovation
Conception
$4,178,000 est. value
Buckley, WA

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

High School Addition
New Construction, Addition - 15,000 SF
Design
Ridgefield, WA

Mark Morris High School Locker Rooms Renovation
Renovation
Bidding
$800,000 to $850,000 est. value
Longview, WA 98632

Toppenish School Projects
Renovation
Bidding
$7,000,000 est. value
Toppenish, WA

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Avanti High School and Annex Remodel
Renovation
Post-Bid
Olympia, WA 98501

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

Capital Projects Bond
Renovation, Addition
Conception
Bothell, WA

Cornerstone Christian Academy Middle/High School
Renovation
Design
Battle Ground, WA 98604

District Maintenance Building Improvements
New Construction
Post-Bid
$2,350,000 est. value
Steilacoom, WA

Architectural Services for High School Addition
New Construction, Addition - 15,000 SF
Results
Ridgefield, WA 98642

New Facility for Community Transitions
New Construction
Conception
Bellingham, WA

Last Updated 05/26/2022 01:19 AM
Project Title

North Thurston Public Schools River Ridge High School Modernization and Additions - Part 3

Physical Address View project details and contacts
City, State (County) Lacey, WA 98513   (Thurston County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $23,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Briefly and without force and. e ffe ct up on the Contract Documents, the Work can be sum-marized as: 1. Offsit.e and onsite utilities. 2. Demolition (of approximately 101,000 sf) and hazardous materi-als removal. 3. Modernization (of approxi-mately 80,000 sf) and new con-struction (of approximately 121,000 sf). 4. Site work and sports fields. 5. Site preparation and utility. connection for portable classroom camp LIS. Work includes but is not limited to: 1. Demolition and hazardous materials removal. 2. Concrete and steel structure systems. 3. Exterior enclosure systems including: asphalt shingles, metal roof panels, metal wall and soffit panels, fiber-cement. siding, poly-vinyl chloride (PVC) roofing. and associated sheet metal flashing and trim, and roof accessories. 4. Interior improvements including: wall, floor and ceiling finishes. 5. Food service equipment and conveyance systems. 6. HVAC, plumbing and fire protection systems. 7. Power and low voltage sys-tems. 8. Civil, landscape and irriga-tion including: earthwork, exterior improvements, and utilities. Work is to be performed in 3 primary phases over 58 months 1. Each phase includes sub-phases, 2. Each of the three phases shall be substantially complete prior to commencing the next one. Project lnvolves but not lim-ited to: 1. Complex phasing and transi-tions between phasing. 2. Temporary facilities includ-ing but not limited to: a. Utilities. b. Safety and security measures including cameras and fencing. c. Exiting pathways and tun-nels and wayfinding signage. 3. Ongoing maintenance and operation of temporary facilities, 4. Work on an occupied site around students, staff and. visi-tors. 5. Need to secure long lead items promptly in order to prevent delaying work.

Details

Middle/Senior High School, 121,000 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents