Similar Projects
Advanced Metering Infrastructure (AMI) Solution for the Connect H20 Program
Post-Bid
$2,500,000 to $4,000,000 est. value
San Antonio, TX

Meter Data Management System (Mdms) Solution for the Connect H20 Program
Post-Bid
San Antonio, TX 78212

Pleasanton Road Water Main Replacement at Hume Road
Results
Less than $3,850,000 est. value
San Antonio, TX

Submeter Repair and Upgrade for Legacy at Crown Meadows
Results
San Antonio, TX 78251

2019 Water Meter Replacement
Post-Bid
Elmendorf, TX 78112

Informal Annual Contract for Water Treatment Services for the Alamodome
Results
San Antonio, TX 78283

Replacement 10" Backflow Preventer for UTSA Boulevard
Post-Bid
$80,000 est. value
San Antonio, TX 78249

Annual Contract for Flex Seal Adjustable Repair Couplings
Results
Less than $170,772 est. value
San Antonio, TX 78200

Toepperwein Road Water Improvements
Post-Bid
Converse, TX 78109

Kitty Hawk/Cibolo Creek 12" Waterlines
Results
Universal City, TX 78148

Redbird Ranch Phase 2 - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
San Antonio, TX 78253

End Point Installation (EPI) Services for the ConnectH20 Program
Results
$2,500,000 to $4,000,000 est. value
San Antonio, TX 78200

Back Flow Inspection, Maintenance, Repair and Installation
Term Contract
Post-Bid
San Antonio, TX 78204

Dickerson 16-Inch Oversize (8-Inch Required) Water Main Extension
Results
Less than $893,001 est. value
San Antonio, TX 78212

Water Chiller - Solid State Starter Replacement
Post-Bid
San Antonio, TX 78236

Last Updated 04/26/2021 07:55 AM
Project Title

Park Forest Water Main Improvements Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 30 LF of 8” PVC, 650 LF of 12” ductile iron, 40 LF of 16” ductile iron, 10 LF of 20” ductile iron, 1553 LF of 24” ductile iron, and 143 LF of 30” ductile iron water main using open-trench methods and mill and overlay pavement restoration in Northwest Bexar County within the City of San Antonio along Lockhill-Selma from the intersection of Lockhill- Selma and Huebner Road to Orsinger Lane while maintaining two-way traffic for the Park Forest Water Main Improvements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents