Similar Projects
J044--PM Services for Boiler Plant with Options
Term Contract
Design
Manchester, NH 03104

WPCF Boiler Replacement
Alteration
Bidding
Berlin, NH

Berlin - Water Protection Control Facility Boiler Replacement
Alteration
Bidding
Berlin, NH 03570

Washington School District - Replacement of Boiler Plant
Post-Bid
Washington, NH 02380

Building Operations and Maintenance Services for Norris Cotton FB, Manchester, NH
Post-Bid
Manchester, NH

J--Boiler Cleaning Services F&O
Results
Manchester, NH 03104

Remove and Replace Boilers and Associated Equipment
Results
Less than $660,000 est. value
Concord, NH

HVAC - Boiler replacement
Alteration
Bidding
$30,000 est. value
Concord, NH 03301

Reverse Osmosis
Post-Bid
Nashua, NH 03060

Boiler Replacement
Results
Alton, NH 03809

N045--Suspended Pumps Replacement Services
Post-Bid
Manchester, NH

Standby Power and Boiler Replacement
Results
Less than $368,200 est. value
Lancaster, NH

Wastewater Treatment Plant - Biofilter Media Removal and Replacement
Alteration
Post-Bid
Manchester, NH

Vehicle Exhaust Rail System (Supply & Install)
Results

Activated Carbon Disposal and Replacement
Alteration
Post-Bid
Manchester, NH

Reported 04/09/2022 12:00 AM
Project Title

Gregg Hall Boiler Plant Replacement Project

Physical Address View project details and contacts
City, State (County) Durham, NH 03824   (Strafford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work for this project includes but is not limited to: Provide Steam Boiler trailer to maintain services to building through demo phase 1, complete demo phase 1 and new work phase 1 as denoted on the plans which includes demo of the steam boilers, and other equipment, new work to include installation of new hydronic boilers and associated equipment. Phase 2 demo and new work to commence once Phase 1 work is complete at which time the building can be switched from the boiler trailer back to the newly installed hydronic system. Work to include entire building controls conversion to Eco structure.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Schedules for HVAC, Schedules for Central Heating Equipment, Heating Boiler Schedule.
Division 26 - Electrical.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents