Similar Projects
Parking for the Spring Street Park Project
Bidding
$33,864 est. value
Oberlin, OH 44074

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

Resurface, Repave and Sealcoat and Stripe the Existing Parking Lot
Post-Bid
Elyria, OH 44035

Elyria East Park Trail Improvement
Results
Elyria, OH 44035

D03 - SRTS Elyria Township Safe Routes to School
Results
$280,652 est. value
Elyria, OH 44035

Lor-Lorain TLCI
Results
$283,119 est. value
Lorain, OH 44052

LOR-Sheffield Lake TLCI
Results
$205,148 est. value
Sheffield Lake, OH 44054

Shady Park Fitness Trail – Phase 3
Results
North Ridgeville, OH 44039

2020 Asphalt Entry Road and Parking Lot Improvements
Results
$400,000 est. value
Lagrange, OH 44050

Broadway Sidewalk Rehabilitation
Results
$178,200 est. value
Lorain, OH 44052

2020 CDBG Ely Fountain Plaza Project
Results
$108,000 est. value
Elyria, OH 44035

Concrete Parking Lot Replacement at 1604 Kansas Avenue
Results
$180,000 to $225,000 est. value
Lorain, OH 44052

2020 CDBG South Park Trail
Results
Elyria, OH 44035

2020 CDBG Downtown Sidewalk Project
Results
$18,900 est. value
Elyria, OH 44035

West Avenue Police Station Parking Improvements
Results
Elyria, OH

Last Updated 02/19/2020 08:56 AM
Project Title

LOR - Black River Bikeway Extension -Phase 4E

Physical Address View project details and contacts
City, State (County) Elyria, OH 44035   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing 0.21 miles of asphalt bikeway/shared use path through the City of Elyria including an approximately 400` long pre- engineered bridge connecting to the existing Black River Bikeway Extension within Cascade Park. Work includes: clearing, demolition, grading, asphalt path construction, bridge abutment/pier construction, installing pre- engineered bridge, drainage improvements, temporary access, signage, and landscaping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents