Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Boerger Pump Parts
Term Contract
Sub-Bidding
Elmsford, NY 10523

Integrated Pest Management
Term Contract
Post-Bid
Yonkers, NY

Dispensers and Tank Field Maintenance Services in NJ, NY and PA
Renovation
Post-Bid

Job Order Contract - General Construction, Upstate
Renovation, Term Contract
Results
$12,750,000 to $17,250,000 est. value

Sodium Hypochlorite 15%
Term Contract
Sub-Bidding
Elmsford, NY 10523

Pest Control/Exterminating Services, Westchester County Parks
Post-Bid
NY

Trees
Term Contract
Sub-Bidding
North Salem, NY 10560

Restroom Trailer
Term Contract
Post-Bid
NY

Backflow Test Kit
Term Contract
Sub-Bidding
Elmsford, NY 10523

Geese Control Service
Term Contract
Post-Bid
Port Chester, Rye Brook, NY 10573

Preventative Maintenance and On-Call Services for Emergency Generators
Alteration
Post-Bid
Yorktown, NY

Exterminating Services as needed for the City of Yonkers Facilities
Term Contract
Post-Bid
Yonkers, NY

Job Order Contracts Regions 1,2,3,4,8,9
Alteration
Post-Bid

Portable Restrooms
Term Contract
Post-Bid
Yonkers, NY

Last Updated 07/22/2022 02:05 AM
Project Title

Transfer Station and Material Recovery Facility Operation and Maintenance

Physical Address View project details and contacts
City, State (County) White Plains, NY 10601   (Westchester County)
Category(s) Industrial/Manufacturing, Single Trades
Sub-Category(s) Industrial Warehouse, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor begins mobilization and other necessary preparations Estimated: February 13, 2023 Contractor begins operation Estimated: February 28, 2023 The County of Westchester and the Refuse Disposal District #1 reserve the right to waive any informalities in the proposals, or to reject any or all proposals. No proposer may withdraw its proposal within forty-five (45) days after the due date for proposals. Pursuant to Chapter 308 of the Laws of the County of Westchester, it is the goal of the County to use its best efforts to encourage, promote, and increase the participation of business enterprises owned and controlled by persons of color or women - Minority Business Enterprise (MBE) and Women Business Enterprise (WBE). The successful proposer, no matter the amount of its proposal, will be required to furnish a Performance and Payment Bond in the amount of seven and one-half million dollars ($7,500,000) with its signed contract.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents