Last Updated 11/10/2021 01:27 AM
Project Title

Reconstruction/Rehabilitation - Bamberg/Barnwell Co

Physical Address View project details and contacts
City, State (County) (Bamberg, Barnwell Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 1.000 Ea Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 450.000 Sy Unclassified Excavation 150.000 Cy Borrow Excavation 4,948.000 Cy Excavation For Shoulder Paving 1,005.312 Sta Hauling Of Excavated Shoulder Material 1,005.312 Sta Cement Modified Recycled Base (10" Unif)-Curing Method b 24,480.000 Sy Portland Cement For Cement Modified Recycled Base Course 860.000 Ton Maintenance Stone 17.800 Ton Hma Shoulder Widening Course 5,021.867 Ton Liquid Asphalt Binder Pg64-22 2,243.531 Ton Full Depth Asph. Pav. Patching 6" Unif. 1,780.000 Sy Milling Existing Asphalt Pavement (Variable) 15,300.000 Sy Milled-In Rumble Strip 26.780 Mi Hot Mix Asphalt Surface Course Type c 1,322.170 Ton Hot Mix Asphalt Surface Course Type d 27,506.840 Ton Driveway Paving-Surface Type d 1,864.375 Ton Permanent Construction Signs (Ground Mounted) 5,256.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 338.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 161,240.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 70.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 2,188.000 Lf Railroad Crossing Symbols - Perm.Pvmt.Marking 2.000 Ea Handicap Symbol - Perm.Pvmt Marking 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 8,050.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 111,380.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 676.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 252,270.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 140.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 4,440.000 Lf Railroad Crossing Symbols - Fast Dry Paint 2.000 Ea Handicap Symbol - Fast Dry Paint 2.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 14,460.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 205,910.000 Lf Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,623.000 Ea Adjust Catch Basin 3.000 Ea Adjust Drop Inlet Adjust d. i. 16.000 Ea Concrete Sidewalk(4" Uniform) 50.000 Sy Detectable Warning Material 290.000 Sf Pedestrian Ramp Construction 400.000 Sy Surface Applied Detectable Warning 180.000 Sf Remove & Dispose Semi-Rigid Gr Device 340.000 Lf Premash w-Beam Strong Post System Wsp3 144.000 Lf Premash Thrie Strong Post Guardrail 120.000 Lf Premash Thriebeam Bridge Conn Tbbc3 4.000 Ea Premash Type t Tl3 Leading 50' 8.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 24.203 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents