Similar Projects
Portable Radio Equipment
Bidding
Parma, OH 44129

Four Wheel Drive Backhoes
Post-Bid

Boom Mowers
Term Contract
Post-Bid

Laundry Room Equipment Installation and Maintenance
Results
Cleveland, OH

Forklifts
Results

Crane Inspection, Maintenance and Repair Service
Term Contract
Post-Bid
Less than $250,000 est. value
Cuyahoga Heights, OH

Various Air Compressors
Results
Cleveland, OH

Asphalt Recyclers and Hot Box
Post-Bid

Materials Handling Equipment, Lifts and Mobile Cranes-Inspection, Maintenance, Repair, and Refurbish
Results
Cleveland, OH

Hydraulic Breaker Attachment
Post-Bid

Wheelchair Lift Replacement - City Hall
Results
University Heights, OH

Controllers, Cabinets and Accessory Equipment 2070, Nema and ATC
Post-Bid

Wet Scrubber System
Results
Less than $115,000 est. value
Cleveland, OH 44100

Skid Steer Loaders
Term Contract
Post-Bid

Safety Equipment - OSHA/PERRP Compliance
Results
Cleveland, OH

Last Updated 12/21/2018 10:51 AM
Project Title

CBMF 3-Post Lift and Fall Protection System

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44104   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $327,522
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Installation of a piston style 3-Post In-Ground lift at existing lift bay #8. The lift shall comprise of one stationary post, in the center, and two movable posts at either ends. Each post shall have a minimum capacity of 30,000 lbs., totaling 90,000 lbs. minimum. Due to the low clearance of some RTA buses, the movable posts shall be capable of being recessed below the finished floor at the pockets of each post or at any position between the minimum and maximum dimensions of the travel range of the movable posts. The movable posts shall be capable of fore and aft travel. The fixed post shall also be capable of being recessed below the floor with the top of the lifting bolster flush to the finished floor level. The power/tank units shall be located outside of the pit and above ground for easy access and maintenance. There shall be a single power/tank unit at a single location for the control all three (3) posts.
Details
Division 11 - Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents