Similar Projects
Last Updated | 12/31/2022 07:32 AM |
Project Title | 2022-2023 MPR Flooring Abatement - Rea , Ensign, Pomona |
Physical Address | View project details and contacts |
City, State (County) | Costa Mesa, CA 92626 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $64,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Asbestos abatement at various sites Start/Delivery Date: 2/2023 Q and A Deadline: 12/14/2022 4:00 PM (PST) Online Q and A: Yes PART 1 GENERAL 1.1 SCOPE-The purpose of this specification is to minimize asbestos exposure to Newport Mesa Unified School District (NMUSD), students, visitors and staff, during removal of building materials that contain asbestos. 1.2 DESCRIPTION OF WORK 1.2.1.1 The work specified herein shall be the removal of asbestos-containing material by contract with persons knowledgeable, qualified, and certified in the removal, treatment, handling, and disposal of asbestoscontaining material, and the subsequent cleaning of the affected environment, who comply with Federal and State Regulations which mandate work practices, and who are capable of performing the work of this contract. 1.2.1.2 The asbestos removal contractor shall supply all labor, materials, equipment, services, insurance, and incidentals which are necessary or required to perform the work in accordance with applicable governmental regulations and these specifications. Insurance includes automotive, general, environmental pollution and workers' compensation insurance. Site: ENSIGN INTERMEDIATE SCHOOL 2000 Cliff Drive Newport Beach, California 92663 Site: REA ELEMENTARY SCHOOL 661 HAMILTON AVENUE COSTA MESA, CALIFORNIA 92627 Rooms: Multi-Purpose Room Floor ACM: 12"x12" and 9"x9" Vinyl Floor Tile (2%-3%) and Mastic (ND). Quantity: Approximately 3,200 SF of floor materials Site: POMONA ELEMENTARY SCHOOL 2051 Pomona Avenue Costa Mesa, California 92627 Room: Multi-Purpose Room, Staff Lounge ACM: 9"x9" Vinyl Floor Tile (3%) and Mastic (2%). Carpet and Base and Mastic in Staff Lounge. Quantity: Approximately 2,700 SF of floor materials. |
||||
Details | 7,127 SF.
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |