Similar Projects
Vine Street School - Heating System Project
Alteration
Post-Bid
Bangor, ME 04401

Holbrook Middle School Indoor Air Quality Improvements
Alteration
Post-Bid
Holden, ME 04429

Veazie Community School Patio
Renovation
Results
Less than $125,000 est. value
Veazie, ME 04401

Holden Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Holden, ME 04429

Abraham Lincoln School - Indoor Air Quality Improvements
Renovation, Alteration - 36,000 SF
Post-Bid
$300,000 est. value
Bangor, ME 04401

UM DP Corbett HVAC Renovation
Alteration
Results
Orono, ME

HVAC Maintenance Services at Seven (7) Locations
Alteration
Post-Bid
$96,814 est. value
Hampden, ME

Eddington Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Eddington, ME 04428

Fruit Street School - Heating System Upgrade project
Alteration
Post-Bid
$70,000 est. value
Bangor, ME 04401

Seawater Systems Water Chiller
Term Contract
Results
Orono, ME

Indoor Air Quality Improvements Fairmount School
Renovation
Post-Bid
$50,000 CJ est. value
Bangor, ME 04401

Hvac Preventative Maintenance and Repair Work in Region 5/Located in Various Locations in the Counties of Washington, Penobscot and Aroostook
Alteration
Results

Indoor Air Quality Improvements - Mary Snow School
Renovation
Post-Bid
$800,000 CJ est. value
Bangor, ME 04401

HVAC, Ductwork and Ventilation Cleaning Services, Region 4 Central Lab
Alteration
Results
Bangor, ME

HVAC Preventative Maintenance and Repair Work - Region 5
Alteration
Results
Portage Lake, Washington, ME

Last Updated 07/26/2022 02:08 PM
Project Title

Indoor Air Quality Improvements - Fourteenth Street School

Physical Address View project details and contacts
City, State (County) Bangor, ME 04401   (Penobscot County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A bid security will be required consisting of a 5 percent (5%) Bid Bond or a Certified Check in lieu of the Bid Bond is required. Performance Bond and Payment Bond, each for 100% of the value of the work are required. The Davis-Bacon Act requirements apply to this project. Although the three projects vary, they generally consist of demolition, installation of ERV's, heat pumps, ductwork, electrical, controls, cleaning, balancing, etc. to complete each of the IAQ projects. Each project requires a separate bid.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents