Similar Projects
The Dansby Tower
New Construction - 1,250,000 SF
Conception
$250,000,000 est. value
Birmingham, AL

Fucci Warehouse
New Construction
Conception
Auburn, AL 36830

Campus No. 124
Renovation, Demolition
Design
$10,000,000 est. value
Pelham, AL 35124

Airport Authority Office Expansion
Addition
Design
Birmingham, AL 35212

Storage Room Addition at Lupton Junior High School
Addition - 1,135 SF
Bidding
Nauvoo, AL 35578

Mazda Toyota Manufacturing Training Facility
Addition
Bidding
Huntsville, AL 35810

New Office Building (Contract D)
New Construction - 1,536 SF
Post-Bid
Irvington, AL 36544

Improvements & Repairs to Marine Resources Maintenance Shed
New Construction - 2,480 SF
Post-Bid
Dauphin Island, AL

Hayden Harris Hall Demolition
Demolition - 12,000 SF
Results
Less than $300,000 est. value
Tuscaloosa, AL

Metal Building for District Six
Results
Huntsville, AL 35801

Ben E. Keith
New Construction - 423,681 SF
Construction
$100,000,000 est. value
New Brockton, AL 36351

New Maintenance (Storage) Facility for Elmore County
New Construction - 15,625 SF
Construction
Wetumpka, AL 36092

Guster Law Firm
New Construction, Demolition - 3,800 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Birmingham, AL 35208

Logistics Park
New Construction
Pending Verification
$16,000,000 est. value
Mobile, AL

Honda
New Construction, Addition
Conception
Tuscaloosa, AL

Reported 12/10/2021 11:57 AM
Project Title

Water World - Phase II Renovations

Physical Address View project details and contacts
City, State (County) Dothan, AL 36303   (Houston County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Office, Theme Park, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,560,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consist of the concession stand renovations with walk-in freezer; renovation of the front gate entrance to accommodate various queuing requirements as well as the addition of a new building that is approximately 2,000 sf to house office space, conference room, bathroom, etc.; renovation of the bathhouse with additional entrances added from the Kids Cove Pool side and locker relocation; the addition of an approximately 20' x 40' chemical and equipment storage building with a 12' x 40' awning; conversion of the existing tube rental area into a food services area and a new structure to house the tube rental sales; replacement of the back deck of the wave pool.

Details

Office, 2,000 SF New Construction, Theme Park, Renovation, Warehouse/Storage, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents