Similar Projects
Design Build Construction Services of New Drainage Systems at Housing Management Offices
Post-Bid
Window Rock, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Kinlichee D/B Paving Project
Results
AZ 86511

PEFO-Asphalt Trail Surface Preservation
Term Contract
Results
Chambers, Petrified Forest Natl Pk, AZ 86028

N5007-CTW/Newcomb Low Water Crossing
Infrastructure
Post-Bid
Window Rock, AZ

Construct Fsr 4 Road Project - Tonto National Forest
Infrastructure
Results
$100,000 to $250,000 est. value
Rio Verde, AZ 85263

Rock Point Chapter Road Maintenance Project
Infrastructure
Post-Bid
Window Rock, AZ

Horsethief Basin Roads Maintenance - Prescott National Forest
Term Contract
Results
Prescott, AZ 86301

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Shoulder Widening
Infrastructure
Results
$17,066,000 est. value
AZ

Culvert Cleaning
Infrastructure
Post-Bid
Saint Johns, AZ

Pavement Preservation
Infrastructure
Results
$7,195,000 est. value
AZ

N112 Culvert Installation
Infrastructure
Post-Bid
Fort Defiance, AZ

System Enhancement
Infrastructure
Results
$1,950,000 est. value
AZ

Road Maintenance Project for 3.5 Miles: Single and Double Coarse Chip Seals With Culvert Replacements
Infrastructure
Post-Bid
Window Rock, AZ

Reported 06/09/2022 12:00 AM
Project Title

NFSR 24 and 25 Roads Surfacing and Stabilization

Physical Address View project details and contacts
City, State (County) Alpine, AZ   (Apache County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The USDA Forest Service, Apache-Sitgreaves National Forest, Alpine Ranger District has a requirement for NFSR 24 and 25 Roads Reconditioning, Aggregate Surfacing, and Road Stabilization, Apache County, Arizona. Work includes reestablishing the road templates on NFSR 24 and 25, by furnishing and placing a 4-inch lift of aggregate base material (3/4-inch minus) and stabilizing 4-inch aggregate with 80/20 lignosulphonate/magnesium chloride blend product. Aggregate Placement will start on NFSR 24 from the end of the previous treatment (Mile Post 5.8) to the intersection of NFSR 24 and NFSR 26 (Mile Post 13). Optional line item - NFSR 25 will be surfaced from intersection of NFSR 24 to approximately Wildcat Bridge (approximately 15 miles). The exact mileage of work on NFSR 25 will be dependent on funding available to award the best value offer received. Option Line Items (in the Schedule) will be used to reduce or extend the mileage total for NFSR 25. SCOPE OF CONTRACT The USDA Forest Service, Apache--Sitgreaves National Forests, Springerville, Arizona, has a requirement for NFSR 24 AND 25 Roads Reconditioning, Aggregate Surfacing, and Road Stabilization on the Alpine Ranger District, Apache County, Arizona. Work includes reestablishing the road template on NFSR 24 and 25, by furnishing and placing a 4-inch lift of aggregate base material (3/4-inch minus) and stabilizing 4-inch aggregate with 80/20 lignosulphonate/magnesium chloride blend product. Placement will take place on NFSR 24 from the end of the previous treatment (Mile Post 5.8) to the intersection of NFSR 24 and NFSR 26 (Mile Post 13). NFSR 25 will be surfaced from intersection of NFSR 24 to approximately Wildcat Bridge (approximately 15 miles). The exact mileage of work on NFSR 25 will be dependent on funding available to award the best value offer received. Option Line Items (in the Schedule) will be used to reduce or extend the mileage for NFSR 25, to award the project. PROJECT LOCATON From Eager, AZ, travel west from the intersection of Central Avenue and Main Street on AZ-Hwy 260 for approximately 3.1 miles. Turn left (south) onto AZ-Hwy 261 and continue for approximately 17.9 miles. At the intersection with AZ-Hwy 273 turn left (south) onto AZ-Hwy 273 and continue for approximately 2.5 miles. AZHwy 273 turns to NFSR 249 (Three Forks Road). Continue travelling NFSR 249 for approximately 0.7 miles. Turn right (south-west) onto NFSR 249E and continue for approximately 0.7 miles to the intersection with NFSR 24. Turn left (south) onto NFSR 24 and at approximately 5.8 miles will be the end of the previous surfacing project. This project begins here and proceeds approximately 7.2 miles south on NFSR 24 to the intersection with NFSR 26. Just north of the Buffalo Crossing Bridge is the intersection with NFSR 25. Turn to the west onto NFSR 25 and the project will continue along this road for approximately 15 miles or as far as funding will allow.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents