Similar Projects
Reported | 06/09/2022 12:00 AM |
Project Title | NFSR 24 and 25 Roads Surfacing and Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Alpine, AZ (Apache County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The USDA Forest Service, Apache-Sitgreaves National Forest, Alpine Ranger District has a requirement for NFSR 24 and 25 Roads Reconditioning, Aggregate Surfacing, and Road Stabilization, Apache County, Arizona. Work includes reestablishing the road templates on NFSR 24 and 25, by furnishing and placing a 4-inch lift of aggregate base material (3/4-inch minus) and stabilizing 4-inch aggregate with 80/20 lignosulphonate/magnesium chloride blend product. Aggregate Placement will start on NFSR 24 from the end of the previous treatment (Mile Post 5.8) to the intersection of NFSR 24 and NFSR 26 (Mile Post 13). Optional line item - NFSR 25 will be surfaced from intersection of NFSR 24 to approximately Wildcat Bridge (approximately 15 miles). The exact mileage of work on NFSR 25 will be dependent on funding available to award the best value offer received. Option Line Items (in the Schedule) will be used to reduce or extend the mileage total for NFSR 25. SCOPE OF CONTRACT The USDA Forest Service, Apache--Sitgreaves National Forests, Springerville, Arizona, has a requirement for NFSR 24 AND 25 Roads Reconditioning, Aggregate Surfacing, and Road Stabilization on the Alpine Ranger District, Apache County, Arizona. Work includes reestablishing the road template on NFSR 24 and 25, by furnishing and placing a 4-inch lift of aggregate base material (3/4-inch minus) and stabilizing 4-inch aggregate with 80/20 lignosulphonate/magnesium chloride blend product. Placement will take place on NFSR 24 from the end of the previous treatment (Mile Post 5.8) to the intersection of NFSR 24 and NFSR 26 (Mile Post 13). NFSR 25 will be surfaced from intersection of NFSR 24 to approximately Wildcat Bridge (approximately 15 miles). The exact mileage of work on NFSR 25 will be dependent on funding available to award the best value offer received. Option Line Items (in the Schedule) will be used to reduce or extend the mileage for NFSR 25, to award the project. PROJECT LOCATON From Eager, AZ, travel west from the intersection of Central Avenue and Main Street on AZ-Hwy 260 for approximately 3.1 miles. Turn left (south) onto AZ-Hwy 261 and continue for approximately 17.9 miles. At the intersection with AZ-Hwy 273 turn left (south) onto AZ-Hwy 273 and continue for approximately 2.5 miles. AZHwy 273 turns to NFSR 249 (Three Forks Road). Continue travelling NFSR 249 for approximately 0.7 miles. Turn right (south-west) onto NFSR 249E and continue for approximately 0.7 miles to the intersection with NFSR 24. Turn left (south) onto NFSR 24 and at approximately 5.8 miles will be the end of the previous surfacing project. This project begins here and proceeds approximately 7.2 miles south on NFSR 24 to the intersection with NFSR 26. Just north of the Buffalo Crossing Bridge is the intersection with NFSR 25. Turn to the west onto NFSR 25 and the project will continue along this road for approximately 15 miles or as far as funding will allow. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |