Similar Projects
Alabama National Guard Construction MATOC
Post-Bid
$2,000 to $5,000,000 est. value

Alabama National Guard Construction MATOC
Post-Bid
$2,000 to $5,000,000 est. value

Z--Base Operations Support(BOS)Services at Whiting Field, FL
Results
$10,000,000 to $20,000,000 est. value
Whiting Field, FL

Z--Base Operations Support(BOS)Services at Whiting Field, FL
Results
$10,000,000 to $20,000,000 est. value
Whiting Field, FL

Montgomery MCRC Anti-Terrorism / Force Protection (ATFP) Upgrades
New Construction, Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Montgomery, AL 36107

Facility Indoor Firing Range Remediation - South Region
Results
Less than $500,000 est. value
Montgomery, AL 36109

F-35 Simulator Building
Post-Bid
$10,000,000 to $25,000,000 est. value
Montgomery, AL

Indoor Firing Range Remediation Central Region
Results
Less than $200,000 est. value
Prattville, AL

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Indoor Firing Range Remediation - North Region
Renovation
Results
Less than $750,000 est. value
Huntsville, AL 35805

Weapons Maintenance Shop (“Towed Artillery”) Anniston Army Depot, AL
New Construction, Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Anniston, AL

Indoor Firing Range Remediation - South Region
Results
Less than $352,000 est. value
Montgomery, AL

Repair Weapon Release B1312
Renovation
Post-Bid
Montgomery, AL

Foley Readiness Center
New Construction - 15,165 SF
Results
Less than $13,000,000 est. value
Foley, AL 36535

Gadsden (FMS #8) Bay Addition
Addition
Results
Less than $1,213,000 est. value
Gadsden, AL 35904

Reported 05/08/2020 12:00 AM
Project Title

New Office Building

Physical Address View project details and contacts
City, State (County) Childersburg, AL 35044   (Talladega County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of demolition of existing facilities and new construction of an office building for the Water Works.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents