Similar Projects
Water Well Replacement at Miller Road Camp for Harris County Precinct 1
Bidding
Houston, TX

HPW - Ground Water Well Rehabilitation Various Sites
Infrastructure
Bidding
$3,240,176 est. value
Houston, TX

Water Well No. 1 Replacement at Water Plant No. 1
Post-Bid
Less than $3,500,000 est. value
Houston, TX

Water Well and Plant Facilities - Site No. 1 Expansion
Post-Bid
Houston, TX

Water Well No. 4 at Water Plant No. 1
Results
Less than $1,450,000 est. value
TX

Ground Water Well Rehabilitation Various Sites
Results
$2,639,083 est. value
Houston, TX 77000

MSB Chilled Water Pump Replacement
Post-Bid
Houston, TX 77030

Well No. 2 Profiling
Results
Less than $270,000 est. value
Houston, TX 77064

Pump, Submersible, 2", Discharge, Trash
Post-Bid
Houston, TX 77251

Water Well Number 1 Rehabilitation
Results
$117,300 est. value
Spring, TX 77388

MHF80 Single Stage Vacuum Pump
Post-Bid
Houston, TX 77251

Water Well No. 2
Results
TX

Lift Station Wet Well and Discharge Pipe Coating
Post-Bid
TX

J045--Reline Main Irrigation Well and Replace Vertical Turbine Pump at Houston National Cemetery. Project Number 851-NRM20-203
Results
$100,000 to $250,000 est. value
Houston, TX

West District Treatment Plant Wet Well Cleaning
Post-Bid
Baytown, TX 77520

Last Updated 06/09/2021 08:20 AM
Project Title

Construction of Water Well No. 5

Physical Address View project details and contacts
City, State (County) Bunker Hill Village, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,254,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an approximately 1,400 vertical foot water well, including drilling of test hole, geophysical logging, water samples, two-piece gravel pack well and submersible pump. Work also includes electrical forafully operational water well and the installation and removal of a temporary self-supporting sound wall during construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents