Similar Projects
Tank and Drain Services
Term Contract
Bidding
VA

Clarion Road Water Extension
Infrastructure
Bidding
Altavista, VA 24517

Design-Build Neabsco-Potomac Commuter Parking Project
New Construction
Post-Bid
$53,328,850 est. value
VA

Replace Maintenance Holes 29,36,37 and 72 JBLE-Ft.Eustis
Post-Bid
$250,000 to $500,000 est. value
Fort Eustis, VA

Central Avenue Streetscape Improvements
Results
$1,600,000 est. value
Staunton, VA

Green Ridge Road Sanitary Sewer Replacement
Results
Roanoke, VA 24011

Church of Jesus Christ Of Latter-Day Saints - Sanitary Project
Renovation
Construction
Alexandria, VA 22038

IALR Parking Lot Repave
Infrastructure
Construction
Danville, VA 24540

Northside PS#15 Service Area Phase IV Water and Sewer Replacement
Infrastructure, Alteration
Bidding
Norfolk, VA

Job Order Contract (JOC) for On-Call Water and Sewer Maintenance, Repairs and Construction
Term Contract
Post-Bid
$1,000 to $500,000 est. value
VA

Rehabilitation of the Gulf Run Sanitary Sewer Force Main
Results
Arlington, VA 22201

Annual Sewer and Combined Sewer Repair, Replacement and New Installations for Capital Improvement Projects
Term Contract
Bidding
Richmond, VA

Water Treatment Plant RAS Pump Line Plug and Check Valve Replacement
Post-Bid
Fredericksburg, VA

Construction of Sandbridge Beach Public Access Improvements - Phases 8 and 9
Results
Virginia Beach, VA 23456

Construction of North Holly IIIB Watershed Improvements
Infrastructure
Bidding
Virginia Beach, VA

Last Updated 10/26/2021 09:01 AM
Project Title

Colonial Place Pump Station 155 Service Area - Phase 2 Water and Sewer Replacement

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,804,524
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Project consist of the installation of approximately 3,849 linear feet of 8-inch sanitary sewer mains, manholes, laterals and cleanouts; also included is the installation of approximately 29 linear feet of 4-inch, 3,579 linear feet of 8-inch, and 686 linear feet of 12-inch water mains and appurtenances; The abandonment and/or removal of existing sewer and water mains and appurtenances are included. Pavement restoration is included. The work is to be completed in 485 days from the Notice to Proceed (NTP).

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents