Similar Projects
RFP Design - Fire Station No. 2 Rebuild
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Corona, CA 92879

Pine Avenue Extension From SR-71 to Chino Creek North Side Only - City of Chino Hills
Infrastructure
Conception
$4,201,000 CJ est. value
Norco, CA 92860

RFQ Contractor - Prequalify Contractors For Perris Valley Pipeline Interstate-215 Tunnels
Infrastructure
Design
$60,000,000 CJ est. value
Perris, CA 92570

Desert Luxury Apartments
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Palm Desert, CA 92260

AutoZone #5327 / Murrieta
New Construction, Infrastructure - 6,500 SF
Bidding
$1,500,000 CJ est. value
Murrieta, CA 92563

FTU Site Improvements
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
March Air Reserve Base, CA 92518

Construction And Installation Of New Truck WRF #1 Solids Handling Scale
New Construction, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Corona, CA 92880

I-15 and SR 76, 78, 79, and 371 Middle-Mile Broadband Network
Infrastructure
Sub-Bidding
$75,000,000 CJ est. value
Riverside, CA 92522

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

RFQ D/B - School of Business Building
New Construction, Infrastructure - 36,000 SF
Post-Bid
$71,000,000 CJ est. value
Riverside, CA 92521

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Sunset Court and Shadow Canyon Circle Waterline Project
Infrastructure
Results
Norco, CA 92860

Inland Valley Medical Center Patient Tower
New Construction, Infrastructure - 290,000 SF
Pending Verification
$170,000,000 CJ est. value
Wildomar, CA 92595

Wingsweep Parcels at Sommers Bend
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Temecula, CA 92590

O'Reilly Auto Parts (MF2) / Menifee
New Construction, Infrastructure - 7,225 SF
Conception
$400,000 CJ est. value
Menifee, CA 92586

Last Updated 08/02/2022 11:03 AM
Project Title

MDP Line 16 Water Pipeline Relocation Project

Physical Address View project details and contacts
City, State (County) Beaumont, CA 92223   (Riverside County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $564,052 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 02, 2022, project was awarded toMCC Equipment Rentals, Inc , awarded amount is $564,051.66.** The Work includes the provision of all equipment, labor, and traffic control, disinfection, and testing to install District furnished pipeline materials and appurtenances necessary to complete the construction of the following, as specified and shown in the Construction Documents: Pipeline 6A - Approximately 500 Linear Feet (LF) of 8" cement mortar lined Ductile Iron Pipe (DIP) plus various laterals, valves, connections, and appurtenances generally along Grand Avenue, east of Martin Lane. Pipeline 7 (P-3040-0027) Approximately 2,500 LF of 12" cement mortar lined DIP plus various laterals, valves, connections, and appurtenances along Grand Avenue, from Jonathan Avenue east to Bellflower Avenue. Pipeline 8 Approximately 900 LF of 8 cement mortar lined DIP plus various laterals, valves, connections, and appurtenances generally along Grand Avenue, from Noble Street east to El Monte Drive. Bidders assume all risk of untimely delivery for bids mailed, or otherwise not personally delivered during normal District work hours. The notation by the District of time and date of bid receipt, shall be conclusive. The site of work is located in the community of Cherry Valley, County of Riverside, California. The work shall be performed by a single contractor under a single contract. All work must be completed within ninety (90) calendar days from Date of Award. If Owner elects to award a contract for the Work, the award will be made within thirty (30) calendar days from the date of bid opening. No bidder may withdraw a proposal for this period. Bidders shall assume full responsibility to honor their bid price during this period. The Director of the Department of Industrial Relations has ascertained the general prevailing rate of per diem wages and the general rate of holiday and over-time work in the locality in which the work is to be performed for each craft or type of workmen needed to execute the Contract or Work as hereinafter set forth (see Labor Code 1770 et.seq.). Copies of rates are on file at the office of the Owner, which copies shall be made available to any interested party on request. The successful Bidder shall post a copy of such determinations at each job site. Attention is called to the fact that not less than the minimum salaries and all Contractors and Subcontractors shall pay wages on this Project. LICENSING REQUIREMENTS. Bidders shall be licensed in accordance with provisions of Chapter 9, Division 3, of the Business and Professional Code of the State of California on the date and time of submittal of the bid documents and shall maintain such license until final acceptance of the work. Required classifications are: Class A and/or General Engineering; Class C-34, Pipeline Contractor. Bidders shall have verifiable experience in similar work. Bidders and their sub-contractors shall also be registered to perform public work pursuant to Section 4104 of the public contract code with the State of California, Department of Industrial Relations. The District cannot award a public works contract to any contractor or subcontractor whose company appears on the ineligible contractors list published by the Labor Commission, per Labor Code, Section 1777.1. All questions relative to this project prior to the opening of bids shall be directed to: Mark Swanson Beaumont-Cherry Valley Water District 560 Magnolia Avenue Beaumont, CA 92223 Telephone: (951) 845-9581 Fax: (951) 845-0159 The Owner reserves the right to reject any or all Bids, to waive any informality or irregularity in any Bid and to make awards in the interest of the Owner, including award to other than the lowest bidder. The Owner reserves the right to have performed the entire Work defined by the Contract Documents or such parts of said Work as the Owner may elect, to combine various alternative bids and bid items within a Bid, and to accept or reject one or more separately scheduled bid items within a Bid. The Owner further reserves the right to withhold issuance of the Notice to Proceed, after execution of the Contract Agreement, for the period not to exceed fifteen (15) days after the date the Contract Agreement is executed. No additional payment will be made to the successful Bidder on account of such withholding. Prospective bidders are invited to present any relevant questions at the pre-bid conference, but insofar as practicable, questions should be prepared in written form and sent to Beaumont-Cherry Valley Water District so as to arrive not later than July 12, 2022 at 2:00 pm. The District will allow formal Requests for Information to be submitted in written form until July 12, 2022 at 2:00 pm, and the District will formally respond to written RFIs by July 14, 2022 at 5:00 pm.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents