Similar Projects
Constructing a Stormwater Pump Station
New Construction
Bidding
Saint Martinville, LA

Lift Stations 16 and 26 Rehabilitation
Renovation
Bidding
Mandeville, LA

River Pump Station Hazard Mitigation
Renovation
Post-Bid
Baton Rouge, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Sunshine Wastewater Treatment Plant - Effluent Pump Station Rehabilation
Renovation
Results
$359,000 est. value
Sunshine, LA

Leo Kerner Lafitte And Pritchard Lift Station Improvements (L-14-10)
Renovation
Bidding
Gretna, LA

Naquin Street Sewer Lift Station
Renovation
Post-Bid
Less than $465,000 est. value
Houma, LA

Construction Of West Monroe Pump Station Repairs
New Construction
Results
Monroe, LA

Pump Station Mechanical, Electrical and Instrumentation Services
Renovation
Bidding
Baton Rouge, LA

Tangi Lakes LS & FM Improvements
New Construction
Post-Bid
$580,000 est. value
Hammond, LA

Lift Station and Blower Controls Electric Panels
New Construction, Alteration
Results
LA

Pete's Highway Lift Station
New Construction
Post-Bid
Denham Springs, LA

First Camellia (PS 510), Second Camellia (PS 511) and W. Camellia (PS 512) Sewer Lift Station Upgrades
Renovation
Post-Bid
Slidell, LA

Farmsite Pump Station Force Main from Pump Station R2-01 to Riverbend Pond
New Construction
Post-Bid
Chalmette, LA

Reported 09/30/2021 12:00 AM
Project Title

High Lift Pump Room and the Panola Pump Station Improvements

Physical Address View project details and contacts
City, State (County) New Orleans, LA   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of general construction Work of the High Lift Pump Room and the Panola Pump Station Improvements. The High Lift Pump Room improvements includes modifications to PMP-210 and PMP-220, new discharge valves and piping, vacuum priming system modifications, PMP-210 and PMP-220 replacement of rotating assemblies including impellers and increased shaft size to add anti-rotation back-spin prevention devices, site work, earthwork, structural and electrical and I&C modifications, and other miscellaneous improvements. The Panola Pump Station improvements includes modifications to PMP-310 and PMP-320, complete rehabilitation of PMP-310, and replacement of the rotating assemblies to PMP-310 and PMP-320 including impellers and increased shaft size to add anti-rotation back-spin prevention devices, new vacuum priming system, new discharge valves and piping, yard piping, site work, earthwork, structural and electrical and I&C modifications, and other miscellaneous improvements. Work is located at Carrollton Water Purification Plant at 8800 South Claiborne Avenue for Sewerage and Water Board of New Orleans .

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents