Similar Projects
Ballantyne Reimagined - Private Road Work
Design
Charlotte, NC 28277

Pediatric ED Addition and Parking Expansion
Addition
Design
Huntersville, NC 28078

W. Mallard Creek Church Road Share Use Path
Infrastructure
Bidding
$900,000 to $1,100,000 est. value
Charlotte, NC 28262

Airfield Crack Sealing Repairs
Term Contract
Bidding
Charlotte, NC

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Westinghouse Multi-Use Path
Post-Bid
$4,079,410 est. value
Charlotte, NC

Tuckaseegee Berryhill Thrift Roundabout
Results
$2,000,000 to $2,500,000 est. value
Charlotte, NC 28206

Grier/Rocky River Left -Turn Lane
Results
Less than $455,552 est. value
Charlotte, NC 28202

Lakeview Road Improvements - Clearing of Utilities
Post-Bid
$20,000 to $40,000 est. value
Charlotte, NC 28272

Progressive Design-Build Services for the Bryant Farms Road Extension Project
Results
$1,200,000 est. value
Charlotte, NC 28202

Construction Of Downtown Greenway - Phase 1 Trailhead
Post-Bid
Huntersville, NC

East Village Infrastructure Upgrades
Results
Charlotte, NC 28223

Bent Creek Culvert Repair
Post-Bid
Charlotte, NC 28227

Uptown Cycle Track
Results
$4,169,000 est. value
Charlotte, NC

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Reported 02/02/2022 12:00 AM
Project Title

West Boulevard Extension

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28263   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the roadway extension of West Blvd from I-485 to Dixie River Rd, the realignment of Garrison Rd, the improvements to Ex. Garrison Rd and Horton Rd, the improvements to the I-485 Ramps, the West Blvd Watermain and all the associated infrastructure as shown on the Plans. The Water Main Extension will be bid as a separate lump sum item within the Overall Bid Proposal. The "Phase A" work is all the work shown in the Plan Set that is East of the Phase Line located at Sta. 11+60 along the West Blvd Extension. The "Phase A" work will tie into the future intersection of West Blvd and Dixie River Road that will be constructed by others. The "Phase B" improvements are a Bid Alternate that will be added should the pending future improvements to the West Blvd Ext. and Dixie River Rd intersection not be constructed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents