Similar Projects
Centerville Turnpike Loop 3 Water Main Phase 2
Infrastructure
Bidding
$300,000 est. value
Chesapeake, VA

Doswell Water Treatment Plant (DWTP) to Railroad Crossing Waterline
Infrastructure
Bidding
$226,000 est. value
Doswell, VA 23047

Ductile Iron Fitting
Post-Bid
Roanoke, VA 24012

Pipe Bid Package
Post-Bid
Roanoke, VA

Rocky Branch Trunk Sewer and Abelia Road Sewer Replacement
Results
Henrico, VA

J--Option - Quarterly Grease Trap Services
Results
Portsmouth, VA

Onsite Sewage System Installation Project
Infrastructure
Bidding
$210,000 est. value
Toano, VA 23168

Utility Cleaning and Plumbing Preventative Maintenance Services
Post-Bid
Arlington, VA

Repair/Replace Underground Utilities Sanitary Sewer Rehabilitation - Phase II
Results
$3,000,000 est. value
Fredericksburg, VA

14 Inch Water Line Replacement
Infrastructure
Bidding
$2,000,000 est. value
Hampton, VA 23669

Gate Valve and Reducing Nipple
Post-Bid
Norfolk, VA

Gravity One - Phase II 24 Inch Water Main Project
Results
VA

Water Main Cleaning and Lining
Infrastructure
Bidding
$400,000 est. value
Arlington, VA

J042--Bldg. 14 Hydrant Repair Hampton VA Medical Center
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Troy Street Water and Sewer Facility Improvement
Results
VA

Reported 04/30/2022 12:00 AM
Project Title

Water System Installation Repair and Maintenance Services 2022

Physical Address View project details and contacts
City, State (County) Saluda, VA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Service Lines, Watermain Repairs, Water Distribution System Maintenance 1. Directional flushing of watermains. 2. Exercise and flush Fire Hydrants annually spread over 4 quarters. 3. Exercise mainline, hydrant and branch valves to include painting of valve box cover and triangle at edge of asphalt annually spread over 4 quarters. 4. Inspection of air relief valves for leaks and damage semi-annually, painting the cover and a circle at the edge of asphalt.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents