Similar Projects
Construction of SW Well #4 (IA DNR Well 13)
Infrastructure
Bidding
$700,000 CJ est. value
Orange City, IA 51041

Construction of SW Well #4 (IA DNR Well 13)
Infrastructure
Bidding
$700,000 CJ est. value
Orange City, IA 51041

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

HMA Resurfacing with Milling - IOWA 9
Infrastructure
Results
IA

PCC Patching - IOWA 9, IOWA 10, U.S. 18
Infrastructure
Results
IA

2022 City of Sioux Center Commercial Development Project
Infrastructure
Construction
$783,190 CJ est. value
Sioux Center, IA 51250

2022 City of Sioux Center Commercial Development Project
Infrastructure
Construction
$783,190 CJ est. value
Sioux Center, IA 51250

2020 Bond - Middle School Improvements - MOC-Floyd Valley School District
Renovation
Pending Verification
$3,500,000 CJ est. value
Orange City, IA 51041

2022 Bond - Rock Valley School District
New Construction, Build-out, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Rock Valley, IA 51247

PCC Pavement - Grade and New
Infrastructure
Bidding
$3,500,000 CJ est. value
Orange City, IA 51041

Kwik Trip / Sioux Center
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Sioux Center, IA 51250

PCC Patching
Infrastructure
Results

RFP Construction Manager - Dordt University - Dining Commons / Recital Hall Addition
Addition, Demolition, Infrastructure
Bidding
Sioux Center, IA 51250

Kitchen Renovation Sioux Center Christian School
Addition, Demolition, Renovation, Infrastructure - 4,869 SF
Post-Bid
$600,000 CJ est. value
Sioux Center, IA 51250

Last Updated 01/20/2023 11:45 AM
Project Title

2022 Puddle Jumper Park Project

Physical Address View project details and contacts
City, State (County) Orange City, IA 51041   (Sioux County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $645,229 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project was awarded to Cleveringa Excavating in the amount of $645,228.95. Site Directions: 100 feet north of intersection of Lincoln place SE and 13th St on the west side of the road Work to Be Done: Base Bid Clearing and Grubbing; Topsoil, On-site; Excavation, Class 10; Subgrade Preparation, 12"; Modified Subbase, 2"; Modified Subbase, 6"; Sanitary Sewer Service Stub, SCH 40. PVC, 4"; Sanitary Sewer Service Stub, SCH 40. PVC, 6"; Sanitary Sewer Cleanout; Storm Sewer, Trenched, 2000D RCP, 15"; Storm Sewer, Trenched, 2000D RCP, 18"; Pipe Apron, RCP, 18"; Subdrain, Non-Perforated Single Wall HDPE, 6"; Subdrain, Perforated Single Wall HDPE, 6"; Subdrain Outlets and Connections, CMP, 6"; Water Service Stub, Polyethylene, 1"; Water Service Stub, Polyethylene, 2"; Water Service Corporation; Water Service Curb Stop and Box; Manhole, SW-402, 48"; Intake , SW-51, 24"x36" Intake, SW-512, 24"; Internal Drop Connection; Connection to Existing Manhole; Pavement, PCC, 6"; Pavement, Integral Colored PCC, 5"; Pavement, Integral Colored, PCC With Exposed Aggregate, 5"; Beam Curb, P.C. Concrete, 6" Width; Removal of Sidewalk; Removal of Driveway, Granular; Sidewalk, PCC, 5"; Detectable Warnings; Full Depth Patches; Pavement Removal; Painted Pavement Markings, Solvent/Waterborne; Painted Symbols and Legends; Temporary Traffic Control; Conventional Seeding, Seeding, Fertilizing, and Mulching; Conventional Seeding, Seeding, Fertilizing, and Mulching (Native Seed Mix); Plants with Warranty; Storm Water Pollution Prevention Plan, Preparation; Storm Water Pollution Prevention Plan, Management; Filter Sock, 8"; Filter Sock, Removal; Rip Rap, Erosion Stone; Silt Fence or Silt Fence Ditch Check; Silt Fence or Silt Fence Ditch Check, Removal of Sediment; Silt Fence or Silt Fence Ditch Check, Removal of Device; Stabilized Construction Entrance; Inlet Protection Device; Inlet Protection Device, Maintenance; Mobilization; Concrete Washout; Playground Surfacing Subbase; Irrigation System, Design-Build; Landscape Bed Preparation; Drinking Fountain; Limestone Blocks; Electrical; Splash Pad Equipment. Alternate #1: Modified Subbase, 2"; Pavement, PCC, 6"; Curb and Gutter, 2.5'x6"; Mobilization Alternate #2: Modified Subbase, 2"; Pavement, PCC, 6"; Painted Pavement Markings, Solvent/Waterborne; Painted Symbols and Legends; Mobilization See Bid Form for exact quantities. Est. Value: $ 515,517.00 Est. Completion Date: June 30, 2023 All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. All proposals shall be plainly legible, sealed, and addressed to the City of Orange City, Attn: Earl Woudstra, City Administrator, 125 Central Avenue South., Orange City, Iowa 51041. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. A certified check or a bid bond of a reputable bonding ompany authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated Damages: Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. Withdrawal of Bids: No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. Payment: The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the City. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual . The right to accept or reject any or all bids and to waive informalities is reserved

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents