Similar Projects
Cherry Street Water Main - 610-0108 - City Of Lebanon
Infrastructure
Conception
$480,000 est. value
Lebanon, OH 45036

North Broadway - Suncrest 926 North Broadway - 610-0083 - City Of Lebanon
Infrastructure
Conception
$770,000 est. value
Lebanon, OH 45036

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
New Construction
Design
$280,000,000 est. value
Middletown, OH 45005

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

2022 Millard Drive Water Main Replacement Project
Infrastructure
Bidding
$1,100,000 est. value
Franklin, OH 45005

2022 Bryant Avenue Water Main Replacement Project
Infrastructure
Bidding
$810,000 est. value
Franklin, OH 45005

Clear Creek Bike Path Connector
Post-Bid
OH

WAR-Clear Creek Bikepath Connector
Post-Bid
Less than $2,450,000 est. value
Franklin, OH

North Broadway Storm Sewer Replacement
Results
Less than $147,439 est. value
Lebanon, OH

Mason High School Asphalt Overlay & Repair
Results
Less than $1,110,000 est. value
Mason, OH 45040

Glosser Road Improvements - 408R-0065 - City of Lebanon
Infrastructure
Conception
$2,950,000 est. value
Lebanon, OH 45036

Cherry Street Reconstruction (Main to New) - 408R-0066
Infrastructure
Design
$1,500,000 est. value
Lebanon, OH 45036

Mulberry Street Water Main Replacement
Infrastructure
Bidding
$861,000 est. value
Lebanon, OH 45036

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Two Lane Resurfacing - CLE/WAR-SR 48-05.73/00.00
Results
Loveland, OH

Reported 06/14/2022 03:32 PM
Project Title

West Warren/Canal Street - 408R-0069 - City Of Lebanon

Physical Address View project details and contacts
City, State (County) Lebanon, OH 45036   (Warren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2025
Bids Due View project details and contacts
Estimated Value $395,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. This project is included in the city's FY 2022-2026Capital Improvement Program. As of June 13, 2022, further details regarding design completion and firm construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents