Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Ashley Acres
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Waukee, IA 50263

Bridge Replacement - CCS - 15th Street
Demolition, New Construction, Infrastructure
Bidding
$1,250,000 CJ est. value
Adel, IA 50003

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

2020 Downtown Street and Utility Improvements
Infrastructure
Results
Perry, IA

North West Meredith Drive Overlay
Infrastructure
Results
$645,407 est. value
Waukee, IA

The Iowa Clinic / Waukee
New Construction, Infrastructure - 40,000 SF
Construction
$23,000,000 CJ est. value
Waukee, IA 50263

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

Casey's General Store #4269 / Waukee
New Construction, Infrastructure - 8,194 SF
Design
$2,000,000 CJ est. value
Waukee, IA 50263

New Hope Church Phase III
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Adel, IA 50003

Last Updated 08/20/2023 03:01 AM
Project Title

ADEL Water Utility Improvements New Well No. 7

Physical Address View project details and contacts
City, State (County) Adel, IA 50003   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $588,400 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of the improvements, which consist of Well No. 7: Construction of one (1) new ground water supply well, pitless adapter and associated site improvements as indicated in the contract documents

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents