Similar Projects
Avalon Assisted Living Addition
Addition - 23,356 SF
Conception
Hillsborough, NJ 08844

Inspira Health at Williamstown Adult Daycare
New Construction - 11,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
NJ 08094

Artis Senior Living at Eatontown
New Construction
Design
$14,233,666 est. value
Eatontown, NJ 07724

Old Matawan Road Assisted Living Facility
New Construction
Design
Old Bridge, NJ 08857

Toilet Room and Laundry Room Renovations
Renovation
Bidding
Neptune City, NJ 07753

Seabrook Continuing Care 5th Floor Repositioning
Renovation - 33,000 SF
Post-Bid
Tinton Falls, NJ 07753

Sycamore Rehabilitation and Assisted Living
New Construction
Post-Bid
Totowa, NJ 07512

Maplewood Senior Living
New Construction - 98,754 SF
Construction
Plainsboro, NJ

Summit Avenue Assisted Living Facility
New Construction, Demolition - 288,000 SF
Construction
$52,000,000 est. value
Montvale, NJ 07645

Residences at Reuten Park
New Construction
Pending Verification
Closter, NJ

Caring Inc - Disabled Community Residences
New Construction
Pending Verification
Egg Harbor Township, NJ

Monarch Senior Housing Complex
New Construction - 7,956 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Mahwah, NJ 07430

The Enclave at Holmdel
New Construction
Design
$5,000,000 to $10,000,000 CJ est. value
Holmdel, NJ 07733

Cedar Crest Village, Mountain View Gardens Phase II Repositioning
Renovation - 40,360 SF
Post-Bid
Pequannock Township, NJ 07444

New Standard Senior Living Facility at Egg Harbor
Addition - 20,176 SF
Construction
$24,000,000 est. value
Egg Harbor Township, NJ 08234

Last Updated 02/18/2022 12:00 AM
Project Title

Brightview at Eatontown

Physical Address View project details and contacts
City, State (County) Eatontown, NJ 07724   (Monmouth County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Construction Commenced June 2021, Construction Completion Expected June 2023
Bids Due View project details and contacts
Estimated Value $19,720,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Assisted Living Facility, 3 Stories Above Grade, 197,000 SF New Construction, 177 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents