Similar Projects
Stormwater System Cleaning and Inspection Services of Historic Brick Arches
Post-Bid
Charleston, SC

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

FY20 Clouter Creek North Cell Ditching
Results
$500,000 to $1,000,000 est. value
Charleston, SC 29403

Grimball Road Drainage Improvements
Results
SC

Huger Street and King Street Intersection Drainage Improvements Project
Post-Bid
Charleston, SC

Storm Water System Shotcrete Lining and Repair Services of Historic Brick Arches
Results
Charleston, SC 29401

Fretwell Street Drainage Improvements
Post-Bid
North Charleston, SC 29406

Construction Services Low Battery Restoration Project - Phase II
Results
Charleston, SC 29401

Thomas Island Regional Pump Station And Interceptor
Post-Bid
SC

Directional Boring
Results
Moncks Corner, SC 29461

Construction Services for the Drainage Outfall Improvement Project - Devonshire Drive and Byrnes Downs
Infrastructure
Post-Bid
Charleston, SC

Fuel Pad Replacement
Results
Moncks Corner, SC 29461

Folly River Park Retaining Wall
Infrastructure
Post-Bid
Folly Beach, SC 29439

Royall Avenue Drainage Improvements
Results
Mount Pleasant, SC 29464

Low Battery Restoration Project - Phase III
Infrastructure
Post-Bid
Charleston, SC

Last Updated 01/31/2022 11:14 AM
Project Title

Van Buren Avenue Drainage Improvements And Water Main Improvements

Physical Address View project details and contacts
City, State (County) North Charleston, SC 29406 (Berkeley, Charleston Counties)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the addition of new storm drainage culverts, catch basins, GABC, and asphalt pavement along Van Buren Avenue. An additive bid is also included for the installation of a new 6” diameter water main (replacing an older smaller water main). The Additive Bid is a part of this project. Also included are incidental construction items necessary to accomplish the project, all as shown on the project drawings and as specified.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents