Similar Projects
Parking Lot Expansion for Freeport Business Park
Infrastructure
Bidding
FL

Parking Lot Expansion for Freeport Business Park
Infrastructure
Bidding
FL

Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Drainage Repairs
Results
Less than $225,000 est. value

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage
Results
Less than $1,387,468 est. value
FL

Western Lake Phase I Drainage Improvements
Results
De Funiak Springs, FL 32433

Fema Sidewalk on Circle Drive
Results
De Funiak Springs, FL 32433

Drainage
Results
Less than $300,000 est. value

Grassing, Seeding, Sodding
Results
Less than $500,000 est. value

Drainage
Results
Less than $200,000 est. value

NRDA Artificial Reef Construction 2019-20 Deployment FWC Grant 19021
Results
FL

Drainage
Results
Less than $400,000 est. value

Last Updated 07/12/2021 04:03 PM
Project Title

Lakewood Drive Drainage and Pedestrian Improvements Phase I

Physical Address View project details and contacts
City, State (County) FL 32435   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides the addition of approximately 0.45 miles of five (5) foot concrete sidewalk from the TDC parking lot, north to CR 30A. The work includes the realignment and paving of a portion of Tresca Drive, topsoil and sod over the old Tresca Drive dirt road connection, reconstruction of 18 feet of existing sidewalk, reconstruction of one concrete driveway, reconstruction of existing curb and gutter and paving at the entrance of Shannon Drive, and the addition of two mid-block crosswalks. Additional work on the project includes maintenance of traffic, clearing and grubbing, erosion control and sodding. Careful coordination with utilities is required. See contract plans for exact details and requirements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents